Course Contents Preliminary estimates Detailed estimating

Similar presentations


Presentation on theme: "Course Contents Preliminary estimates Detailed estimating"— Presentation transcript:

1 Course Contents Preliminary estimates Detailed estimating
Culverts Bridges Buildings Roads Analysis of rates 30 April 2019

2 Preliminary Estimates
PAE Currently FAE CCE RF LS 30 April 2019

3 Detailed Estimating Buildings Culverts Bridges Roads Earthworks
Up to plinth level Above plinth level Culverts Bridges Roads Earthworks 30 April 2019

4 Analysis of Rates Total workdone Material and labour requirements
Estimated cost Actual PAE or CCE or RFT 30 April 2019

5 Estimating Drawings Specifications Required items
Detailed measurements Content Time 30 April 2019

6 Estimating Complete items Quantity Measurements Content calculation
Rates 30 April 2019

7 Second Term Buildings Culverts Analysis of rates Above plinth level