Download presentation
Presentation is loading. Please wait.
1
Name - WirelessHD March 2010
doc.: IEEE /XXXr0 Sep 19, 2007 March 2010 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Multi-PHY-Mode Management g WPAN System – MAC/PHY Collaboration] Date Submitted: [16 March 2010] Source: [C.S. Sum, H. Harada, F. Kojima, R. Funada, Z. Lan] Company [NICT] Address [3-4, Hikarino-oka, Yokosuka, , Japan] Voice: [ ], FAX: [ ], Re: [] Abstract: [Proposal for Multi-PHY Mode Management] Purpose: [This document provides a list of the editing staff that will be working on g.] Notice: This document has been prepared to assist the IEEE P It is offered as a basis for discussion and is not binding on the contributing individual(s) or organization(s). The material in this document is subject to change in form and content after further study. The contributor(s) reserve(s) the right to add, amend or withdraw material contained herein. Release: The contributor acknowledges and accepts that this contribution becomes the property of IEEE and may be made publicly available by P C.S. Sum Name - WirelessHD
2
March 2010 High Level Summary This presentation provides the overview of the mechanism specified for coexistence among multiple PHY layer design in the TG4g system This presentation highlights the corresponding MAC changes in the proposal This presentation intends to facilitate discussions to bridge the collaboration between PHY and MAC specifications regarding the multi-PHY- mode coexistence topic C.S. Sum
3
Abbreviations MPM - Multi-PHY-Mode NC – network coordinator
March 2010 Abbreviations MPM - Multi-PHY-Mode NC – network coordinator CB – Coexistence beacon Common Signaling Mode – CSM C.S. Sum
4
Presentation Outline TG4g MPM Management Scheme – Motivation
March 2010 Presentation Outline TG4g MPM Management Scheme – Motivation TG4g MPM Management Scheme – How It Works TG4g MPM Management Scheme – Common Signaling Mode Required MAC Changes Proposed Future Collaborations C.S. Sum
5
TG4g MPM Management Scheme ~Motivation~
March 2010 TG4g MPM Management Scheme ~Motivation~ There are a total of three PHY layer designs specified in the TG4g: FSK, OFDM and OQPSK If multiple networks with respective PHY modes are co-located, co-channel interference will occur A mechanism that facilitates the coexistence of multiple PHY modes have to be specified C.S. Sum
6
TG4g MPM Management Scheme ~How It Works~
March 2010 TG4g MPM Management Scheme ~How It Works~ Step 0: For cross-PHY communication to take place, a common PHY language shall be specified Step 1: Before starting a network in a channel, an NC shall scan for a CB Step 1.1: Upon receiving CB, the NC shall not use the channel, or achieve synchronization with existing network Step 1.2: If not receiving CB, the NC will start a network the conventional way (e.g. sends beacon etc) Step 2: After occupying the channel, the NC shall send out CB periodically The cycle goes on for new incoming networks Refer 10/043r0 for details C.S. Sum
7
TG4g MPM Management Scheme ~Common Signaling Mode~
March 2010 TG4g MPM Management Scheme ~Common Signaling Mode~ Only NCs are required to support the CSM, optional for other devices Since CB is the common platform to bridge negotiation among NCs with different PHY modes, it has to be recognizable by these NCs A common PHY specification is specified to send the CB, namely the Common Signaling Mode (CSM) All NCs are able send the CB employing the CSM All NCs are able scan the CB sent in the CSM For implementers seeking to employ multiple PHYs in one system, CMS needs to be used C.S. Sum
8
Required MAC Changes Adding a Coexistence-beacon (CB)
March 2010 Required MAC Changes Adding a Coexistence-beacon (CB) In short, the CB is a beacon to facilitate discovery among networks with different PHY modes The CB is functionally similar to the beacon, with some additional information to facilitate inter-PHY-mode coexistence Corresponding procedural changes Refer 10/090r0 for the details C.S. Sum
9
Proposed Future Collaborations
March 2010 Proposed Future Collaborations Discussion with TG4e Allocation of one frame type value What completed (10/090) The PHY specification for CSM The CB frame format The procedural descriptions Other related modifications C.S. Sum
10
March 2010 References 10/043r0 – power-point slides of the Multi- PHY-Mode management proposal 10/090r0 – text version of the Multi-PHY- Mode management proposal C.S. Sum
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.