Download presentation
Presentation is loading. Please wait.
Published byWilfried Florian Eberhardt Modified over 5 years ago
1
CTI Contribution to TDL meeting 9th April 2015
Anthony Wiles – Miguel A. Reina © ETSI All rights reserved
2
Open Source issues Not all OS issues need to be resolved before the STF starts ETSI/CTI view is that the STF will do the initial implementation and build up to the creation of the OS project for submission to Eclipse Eclipse (and by assumption EPL) have been agreed by the Board (as stated in the ToR) Changing may be problematic. Need strong argument to do so. GIT/GITHub will shortly be installed at ETSI Strongly preferred to use GIT to be used by the STF CTI does not feel qualified at this moment to make a decision on the platform © ETSI All rights reserved
3
ETSI Users of TDL Three levels of priority
Selected TCs as trial run with CTI ETSI syntax (Test Objectives) Minimum TDL features to try out and get feedback TPs only ETSI TBs (step 1) Need ETSI syntax (Test Objectives) Subset of TDL (see next slide) TP -> high-level TDs Conformance and interop 3GPP and TBs (step 2) Full support of TDL features (see next slide) © ETSI All rights reserved
4
Features for step 1 Test objectives Test configurations
Simple and structured data types Static and dynamic data use Basic data operations (mapping, data store) Basic behaviour features (alternative, verdict assignment, interaction, break, stop) Basic timer operations (start, stop, timeout) © ETSI All rights reserved
5
Features for step 2 TD referencing
All advanced behaviour (exceptional, loops, parallel, periodic) Time operations Other packages import © ETSI All rights reserved
6
Thank you! © ETSI All rights reserved
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.