Download presentation
Presentation is loading. Please wait.
Published byKalyn Whitenton Modified over 10 years ago
1
Continuous Improvement Check Do Act Plan Time Quality level Copyright © 2006 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin
2
Lead a Plan-Do-Check-Act (PDCA) process improvement initiative. Use quality tools for analysis and problem solving. Compare and contrast the corporate programs for quality improvement. Learning Objectives
3
Foundations of Continuous Improvement - Customer Satisfaction - Management by Facts - Respect for People Plan-Do-Check-Act (PDCA) Cycle Problem Solving (10 steps) Quality and Productivity Improvement Process
4
Quality Tools Check Sheet Run Chart Histogram Pareto Chart Flowchart Cause-and-Effect Diagram Scatter Diagram Control Chart
5
Check Sheet
6
Quality Tools Check Sheet Run Chart Histogram Pareto Chart Flowchart Cause-and-Effect Diagram Scatter Diagram Control Chart
7
Run Chart
8
Quality Tools Check Sheet Run Chart Histogram Pareto Chart Flowchart Cause-and-Effect Diagram Scatter Diagram Control Chart
9
Histogram of Lost Luggage
10
Quality Tools Check Sheet Run Chart Histogram Pareto Chart Flowchart Cause-and-Effect Diagram Scatter Diagram Control Chart
11
Pareto Chart of Problems 8-11
12
Pareto Analysis of Flight Departure Delay Causes
13
Quality Tools Check Sheet Run Chart Histogram Pareto Chart Flowchart Cause-and-Effect Diagram Scatter Diagram Control Chart
14
Flowchart at Departure Gate Passenger Arrives at Gate Wait for row call Proper Boarding Pass Directed to Appropriate Gate Oversize Carry-on Check Luggage Passenger Boards Aircraft Yes No 8-14
15
Quality Tools Check Sheet Run Chart Histogram Pareto Chart Flowchart Cause-and-Effect Diagram Scatter Diagram Control Chart
16
Cause-and-Effect Chart for Flight Departure Delay (Fishbone Chart) 8-16
17
Quality Tools Check Sheet Run Chart Histogram Pareto Chart Flowchart Cause-and-Effect Diagram Scatter Diagram Control Chart
18
Scatter Diagram
19
Quality Tools Check Sheet Run Chart Histogram Pareto Chart Flowchart Cause-and-Effect Diagram Scatter Diagram Control Chart
20
expected Lower Control Limit 19981999 Control Chart of Departure Delays
21
Marriott Personnel Programs Zero Defects (Crosby) Demings 14 Point Program Malcolm Baldrige Quality Award ISO 9000 Six-Sigma Corporate Programs for Quality Improvement
22
Six Sigma DMAIC Process Steps StepDefinition DefineDefine project objectives, internal and external customers MeasureMeasure current level of performance AnalyzeDetermine causes of current problems ImproveIdentify how the process can be improved to eliminate the problems ControlDevelop mechanisms for controlling the improved process 8-22
23
The Seven-Step Method (SSM) Step 1: Define the project Step 2: Study the current situation Step 3: Analyze the potential causes Step 4: Implement a solution Step 5: Check the results Step 6: Standardize the improvement Step 7: Establish future plans
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.