1 Smart Grid Update – January 2011
doc.: IEEE /0028r0 January 2011 Smart Grid Update – January 2011 Name Company Address Phone Bruce Kraemer Marvell 5488 Marvell Lane, Santa Clara, CA, 95054 Date: 2011-January-10 Abstract: NIST PAP#2 Status Australian Smart Metering Bruce Kraemer, Marvell Bruce Kraemer (Marvell)

2 Call Topics Agenda Topics for this call PAP2 Report Status
January 2011 Call Topics Agenda Topics for this call PAP2 Report Status New Australian Smart Metering RFI Additional topics for LA SGIP news UK Consultation Status FG-Smart in ITU Bruce Kraemer, Marvell

3 Schedule as of Nov 2010 NIST Timeline January 2011 Draft 0.5
doc.: IEEE /0028r0 January 2011 NIST Timeline Schedule as of Nov 2010 Draft 0.5 July 28, 2010 Call for Input to Section 6 August 4, 2010 End of draft 0.5 review period September 15, 2010 SGIP face-to-face, St Louis Tentative PAP 2 meeting September 16, 2010 September 30, 2010 Release of draft 0.6 October 29, 2010 End of draft 0.6 review period November 4, 2010 OpenSG meeting, Miami Tentative PAP 2 meeting December 3, 2010 SGIP face-to-face, Chicago PAP 2 meeting Release of Version 1 Bruce Kraemer, Marvell Bruce Kraemer (Marvell)

4 Schedule as of Jan 2011 NIST Timeline January 2011 Draft 0.5
doc.: IEEE /0028r0 January 2011 NIST Timeline Schedule as of Jan 2011 Draft 0.5 July 28, 2010 Call for Input to Section 6 August 4, 2010 End of draft 0.5 review period September 15, 2010 SGIP face-to-face, St Louis Tentative PAP 2 meeting September 16, 2010 September 30, 2010 Release of draft 0.6 October 29, 2010 End of draft 0.6 review period November 4, 2010 OpenSG + PAP2 meeting, Fort Lauderdale December 3, 2010 Extended edit period January 15, 2011 Release of Version 1 Continuation of project to extend findings June/July 2011 Release of Version 2 Bruce Kraemer, Marvell Bruce Kraemer (Marvell)

5 January 2011 NIST PAP2 Version 0.6 was reviewed extensively in 802 and suggested changes generated by group and documented in 1316r4 were supplied to NIST (Doc 1396-r3) NIST Version 1.0 of the PAP2 report is expected to be available for review around January 15 perhaps in time for the Los Angeles meeting. Bruce Kraemer, Marvell

6 January 2011 Australia Australia has issued a call for candidates for their Smart Metering HAN Responses from 802 should be provided Probably best from individual WG, e.g , but some coordinated discussion required Because of the tight association of technology to metering application functionality, responses to many of the questions will be very difficult Bruce Kraemer, Marvell

7 January 2011 More Details The NSMP HAN interface standard RFI document, and the Smart Metering Infrastructure Minimum Functionality Specification documents are published below (under BRWG documentation) or downloaded via the following links: NSMP - HAN interface standard RFI version 1.1, PDF, 156KB BRWG deliverable 01 - Smart Metering Infrastructure (SMI) Minimum Functionality Specification v1.1, PDF, 1237KB ~ 100 additional documents on meetings minutes, requirements, national goals, etc can be found on the web site. Bruce Kraemer, Marvell

8 January 2011 Australian HAN RFI Request for information– home area network (HAN) interface standard The NSSC is required under its terms of reference to provide advice to the Ministerial Council on Energy's (MCE's) Standing Committee of Officials (SCO) on an open standard to support the provision of a home area network (HAN) for customers using the smart metering infrastructure. The NSSC has issued a request for information (RFI) to standard organisations to provide information on the capabilities of their HAN standard to meet the minimum functionality requirements for a HAN. The objectives of the RFI are to confirm that: the HAN minimum functionality requirements (section 7.9 of the Smart Metering Infastructure Minimum Functionality Specification, version 1.1) are clearly understood and unambiguously stated one or more standards are capable of meeting the minimum functionality requirements for a HAN interface Bruce Kraemer, Marvell

9 Australian HAN RFI January 2011
The schedule for the RFI is as follows: 20 December 2010 Issue the RFI to standards organisations 21 January 2011 Standards organisations to register their participation via 31 January 2011 Closing date for questions 11 February 2011 Submissions due date 14 to 25 February 2011 Preparation of initial evaluation and first draft of review to be sent to the BRWG 28 February 2011 Issue RFI draft evaluation to the BRWG 8-9 March 2011 First BRWG workshop review 10-18 March 2011 BRWG's HAN Technical Group work (as required) 5-6 April 2011 Final BRWG workshop review 12 April 2011 Submission of the RFI report and Smart Metering Infrastructure Functionality Specification Change Control to the NSSC 20 April 2011 NSSC meeting May 2011 Issue HAN interface standard report to the MCE's SCO Bruce Kraemer, Marvell

10 January 2011 RFI Sample Bruce Kraemer, Marvell

11 January 2011 RFI Sample Bruce Kraemer, Marvell

12 January 2011 difficult to respond Bruce Kraemer, Marvell

13 Basic Project Plan 802.11 submitted notification of intent to respond.
January 2011 Basic Project Plan submitted notification of intent to respond. Use Jan 12 call to raise awareness & determine how/if to respond Use Smart Grid ad hoc meetings in LA to Coordinate with generate questions identify volunteers prepare initial responses Use reflector and subsequent calls to finalize responses prior to Feb 11 deadline Bruce Kraemer, Marvell