Download presentation
Presentation is loading. Please wait.
1
Status of work in grid event production
Peter Kodyš + Pavel Řezníček For b-physics May 05, 2005 b-physics meeting 5/03, 2005, Peter Kodys
2
b-physics meeting 3/21, 2005, Peter Kodys
Status Running: bphys simul+digit.Lambdab_mumu_Lambda bphys simul+digit.Bd_mu6mu4_K0star bphys simul+digit.Bs_mu6mu4_phi Problems: Unstable working PoolFileCatalog registration Efficiency: % submitions find source file !!! Comment: More than submitions per 16 days Only 227kEvents (2270 jobs) done Yield ~ 11% Problem is solving with: Pavel, Alessandro, James Prague Site “golias”: Jiri Chudoba, Jiri Kosina, Jan Svec b-physics meeting 3/21, 2005, Peter Kodys
3
b-physics meeting 3/21, 2005, Peter Kodys
4
b-physics meeting 3/21, 2005, Peter Kodys
5
b-physics meeting 3/21, 2005, Peter Kodys
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.