Presentation is loading. Please wait.

Presentation is loading. Please wait.

PRIME Ki-systems update

Similar presentations


Presentation on theme: "PRIME Ki-systems update"— Presentation transcript:

1 PRIME Ki-systems update
Ms. Jymdey Yeffimo – PRIME Technical leader August 16, 2016

2 OUTLINE Update on ki-projectsTM data quality
Update on IDB data entry status

3 Update on ki-projectstm data quality
Validation Consistency between ki-projects and dashboard All data validated within report Existence of verification documents Sign-up sheets complete Timeliness

4 Update on ki-projectstm data quality
Reliability Reports using updated format Reports using correct data collection method Precision Reports with margin of error lower than 10% Reports with complete fields entered

5 Validation Consistency between ki-projects & dashboard
Data validated within report

6 validation Verification documents exist Sign-up sheets are complete

7 TIMELINESS

8 RELIABILITY

9 PRECISION

10 Update on IDB data entry status BY CLUSTER

11 Update on IDB data entry status BY IR

12 Thank you Jymdey Yeffimo,

13 To insert your implementing partner institutional logo, go to View >> Slide Master, and replace the gray box with your logo, placing it to the right of the USAID logo at the bottom. No text or partner logos can be placed within the upper blue banner.


Download ppt "PRIME Ki-systems update"

Similar presentations


Ads by Google