Week 1 Task Management Webmaster - Michael, Mustansir
Budget Analysis and Ordering - Yeonshin Testing - Michael, Mustansir, Yoon Design – Michael, Mustansir, Ragad Building/Soldering – Yoon Alignment Tolerance & Analyisis – Mustansir, Yoon
3
Week 2 Test Receiver Board Results
PRBS7 K 28.7
4
Week 3 – Optical Link Budget
5
Week 4 – Transceiver Schematic
6
Week 5 – Parts Ordered
7
Week 6 – Power Supply Filter
8
Week 7 – Final PCB Layout
9
Transceiver Boards Standard Design Aggressive Design
10
Week 8 – Receiver Testing
Receiver Conservative PRBS7 Receiver Aggressive PRBS7 Conservative/Aggressive Receiver 5 dB
11
Week 9 – Tx Testing Conservative TX 0 dB Conservative Tx 5 dB
Aggressive Tx 0 dB Aggressive Tx 5 dB PRBS7
12
Week 10 Loopback Testing Aggressive Design
Conservative PRBS7 0 dB Aggressive PRBS7 0 dB Aggressive D dB
13
Week 10 – Alignment Tolerance Bad Results
D dB PRBS7 0 dB K dB
14
Week 11 – Alignment Tolerance Good Results
Rx 0 dB D21.5 Rx 0 dB PRBS7 Rx 0 dB K28.5
15
Week 12 – Shielding 1 of 3 K28.5 Before Shielding 5 dB
PRBS7 Before Shielding 5 dB K28.5 After Shielding 5 dB PRBS7 After Shielding 5 dB
16
Week 12 – Shielding 2 of 3 K28.5 Before Shielding 10 dB
PRBS7 Before Shielding 10 dB K28.5 After Shielding 10 dB PRBS7 After Shielding 10 dB
17
Week 12 – Shielding 3 of 3 K28.5 Before Shielding 15 dB
PRBS7 Before Shielding 15 dB K28.5 After Shielding 15 dB PRBS7 After Shielding 15 dB
18
Alignment Tolerance
19
Final Gantt Chart
20
How Much? Quantities of 1000