FAIR LAWN BOARD OF EDUCATION BUILDINGS & GROUNDS ACCOMPLISHMENTS BUILDINGS & GROUNDS ACCOMPLISHMENTS
2
SASSO FIELD New Turf Field Installed
3
Sasso Field Painted buildings & new tent
4
Sasso Field Lightning Detector
5
SASSO FIELD New cameras Installed Sealed blacktop under bleachers
6
High School A-gym Floor Refinished
7
FAIR LAWN HIGH SCHOOL B-WING CAFETERIA ROOF
8
HIGH SCHOOL Abated 3 classrooms (Rms B120, B122, B204) Painted 5 classrooms Retiled A-wing girls bathroom HS Stage Lighting HS Lighting (pending) Auditorium underground conduit, carpeted aisles
9
Memorial – Completed installation of windows on west side of building
10
Memorial School Painted lockers on 1 st and 2 nd floor
11
MEMORIAL SCHOOL – Trimmed trees back from field
12
Memorial School Trimmed trees back from steps
13
MEMORIAL SCHOOL Installed new energy efficient LED lights in auditorium Rm 214 – converted from storeroom to classroom instruction Auditorium – rebuilt exhaust fan Repaired terrazzo floor outside main office
14
THOMAS JEFFERSON SCHOOL Repaved & striped front lot Widened exit driveway to allow right & left turns upon exiting
15
THOMAS JEFFERSON SCHOOL Painted lockers and installed new lockers on 1st floor Carpeted 5 offices in Child Study Team room Boys locker bathroom and boys room by Rm 119 – installed new floor drains & waterless urinals Installed wireless clock system Rm 116 – abated floor and installed VCT tile
16
EDISON SCHOOL Moved sign from HS and installed at Edison
17
EDISON SCHOOL Paving of front lot and re-striping for bus access (pending) Repaired windows
18
FORREST SCHOOL Installed VCT tile in 4 classrooms Moved KECO from Forrest to Edison School
19
Lyncrest School Canopy, Ceiling & LED lights
20
MILNES SCHOOL Refurbished 2 storm drains in rear parking lot and repaved.
21
INSTALLED CHAIRLIFT AT MILNES SCHOOL
22
Radburn School Kindergarten Windows Installed new energy efficient thermopane windows
23
RADBURN SCHOOL Converted music room to new kindergarten room on ground floor Installed new security gate on ground floor by new addition lobby Ground floor boys room in stairwell – installed new floor drains and waterless urinals
24
Warren Point School Installed new digital sign on Broadway
25
Warren Point School Milled and repaved teacher parking lot and installed new security gates
26
Warren Point School Installed 100 cubic yards of mulch on playground
27
Warren Point School Installed new Fire Doors in old wing-1 st floor
28
Westmoreland School Installed energy efficient thermopane windows in gym
29
WESTMORELAND SCHOOL Replacement of bathroom partitions (pending)
30
DISTRICT Installed security locks in all school buildings Room numbers stenciled on exterior windows in all school buildings Purchased maintenance truck Purchase of leaf vacuum (pending) Purchase of salt spreader (pending)