Download presentation
Presentation is loading. Please wait.
Published byChristian White Modified over 5 years ago
1
Ashfield District Council Disabled Facilities Adaptations
Value of contract: Length of contract: Contract start date: Completion date: £125,000 On going Works/services provided: Strip out of existing bathroom Plumbing and heating Electrical installation DDA compliant sanitary ware installation Ceramic wall tiling Non-slip vinyl flooring Detailed description of contract: Bathroom adaptation works to provide level access showering facilities on behalf of homeowners qualifying for grant funded modifications to improve their quality of living. User needs determined by Occupational Therapist, but generally to include wet floor shower former, thermostatically controlled shower unit, half height screens for assisted bathing, new sanitary ware and flooring. Particular challenges to be overcome: Contact details: 95% of the works undertaken in occupied homes 90% success rate of completing the installation within 5 days Temporary services re-connected at the end of each day Daily liaison with tenants and a clear commitment to achieving the agreed targets to minimise disruption to their daily routine Ms Anna Thomas Disabled Facilities Grants Team Ashfield District Council Council Offices Urban Road Kirkby In Ashfield. NG17 8DA Tel:
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.