Download presentation
Presentation is loading. Please wait.
1
PCS Link I-TMS 3 PCS IT Day
2
Agenda Preconditions From ROMAN to PCS Link PCS Link
3
Preconditions PROCESS TYPES: In scope : New Path Requests
Late Path Requests Out of scope: Studies Ad Hoc Path modification Path Alteration PCS Link
4
Preconditions PROCESS PHASES: In scope : Path Elaboration
Post Processing PCS Link
5
Preconditions TYPE OF DOSSIERS: In scope :
Commercial trains (+ only the commercial part of the train) Passengers Goods PAP no PAP Out of scope : Empty runs PCS Link
6
Preconditions One way: planningstool PCS
Only update of the trainschedule in PCS No automatic update of the trafic lights (remains manual) PCS Link
7
From ROMAN to PCS ROMAN:
Our national planningstool for the “long term”-planning Developed by Atos Wordline PCS Link
8
From ROMAN to PCS Link with PCS:
Daily transfer of data from ROMAN to PCS Link is made via: PCS dossier number PCS path number PCS Link
9
From ROMAN to PCS Link with PCS: PCS Link
10
From ROMAN to PCS PCS Link
11
From ROMAN to PCS Link with PCS:
Comparison between the path of ROMAN and the path of PCS Only check of: (National) Trainnumber Locations (stops, run through, border, …) Times Activity type (run through, commercial stop, …) Location type (origin, handover, destination, …) Loco type Train length (commercial + overall) For freight trains only: Braking regime PC-codification Weight (commercial + overall) PCS Link
12
From ROMAN to PCS Link with PCS:
Case 1: (# running days in PCS) <> (# running days in ROMAN) PCS ROMAN Action Master 1 path Update of the Master > 1 path Add new slave(s) + slave(s) No update, nor delete of the slave(s) Update of the slave(s) with a link in ROMAN Add slave(s) with no link in ROMAN No update, nor delete of the slave(s) without a link in ROMAN PCS Link
13
From ROMAN to PCS Link with PCS:
Case 2: (# running days in PCS) = (# running days in ROMAN) PCS ROMAN Action Master 1 path Update of the Master > 1 path Add new slave(s) + slave(s) Delete of the slave(s) with only Belgian points Update of the slave(s) with a link in ROMAN Add or update slave(s) with no link in ROMAN Delete of the slave(s) with only Belgian points and no link in ROMAN PCS Link
14
? QUESTIONS PCS Link
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.