Presentation is loading. Please wait.

Presentation is loading. Please wait.

14/05/2008 Brussels, AP4 Workshop SWIM-SUIT Giuliano dAuria SELEX Sistemi Integrati.

Similar presentations


Presentation on theme: "14/05/2008 Brussels, AP4 Workshop SWIM-SUIT Giuliano dAuria SELEX Sistemi Integrati."— Presentation transcript:

1 14/05/2008 Brussels, AP4 Workshop SWIM-SUIT Giuliano dAuria SELEX Sistemi Integrati

2 14/05/2008 Brussels, AP4 Workshop Setting the Scene Single European Sky foresees implementation of a European ATM Network System Wide Information Management (SWIM) represents main technical enabler Many initiatives have already focused on the operational aspects of an ATM Network offering timely information, distributed when and where needed C-ATM, OATA PROJECT, EUROCAE Working Groups 59, 61 and 69 ATM Network Technical Enabler SWIM Technical Enabler

3 14/05/2008 Brussels, AP4 Workshop Is it Feasible? How strong are the foundations? Still no clear indication on how to implement SWIM Investigate the feasibility of an initial System Wide Information Management infrastructure for the European Air Transport System. ATM Network Technical Enabler SW IM SWIM-SUIT Overall Objective

4 14/05/2008 Brussels, AP4 Workshop SWIM-SUIT Objectives SWIM Prototype Information management processes Quality of Service Safety and security aspects Data Property Information Models Information access and security mechanisms Cost Benefit Specification of the requirements for the SWIM implementation Validation of the technologies identified as enablers of the SWIM concept Assessment of the Organisational, Legal and Financial Implications SWIM FEASIBILITY

5 14/05/2008 Brussels, AP4 Workshop SWIM-SUIT Prototype AOC Flight Simulator MXP AIRPORT Lisbon AIRPORT ISPOC Prototype ATFCM (CFMU) ACC/APP ACC ACC/APP

6 14/05/2008 Brussels, AP4 Workshop SWIM-SUIT Prototype Manage Content Check Store Acquire Data AOC Flight Simulator MXP AIRPORT Lisbon AIRPORT ISPOC Prototype ATFCM (CFMU) ACC/APP ACC ACC/APP

7 14/05/2008 Brussels, AP4 Workshop SWIM-SUIT Prototype AOC Flight Simulator MXP AIRPORT Lisbon AIRPORT ISPOC Prototype ATFCM (CFMU) ACC/APP ACC ACC/APP Disseminate Data Manage Access Security Licensing Pricing

8 14/05/2008 Brussels, AP4 Workshop SWIM-SUIT Prototype ATM Virtual Information Pool AVI POOL AOC Flight Simulator MXP AIRPORT Lisbon AIRPORT ISPOC Prototype ATFCM (CFMU) ACC/APP ACC ACC/APP

9 14/05/2008 Brussels, AP4 Workshop SWIM-SUIT Prototype CENTRAL FLOW MANAGEMENT AIRCRAFT OPERATOR AIR TRAFFIC CONTROL ACC AIR TRAFFIC CONTROL APP AIRPORT OPERATOR AIRCRAFT SWIM Prototype Network ( WAN connecting all the sites) Wrappers connecting legacy applications to Prototype Network One or more technologies will be identified and Tested

10 14/05/2008 Brussels, AP4 Workshop SWIM-SUIT Focus Network Infrastructure Middleware ATC Applications Airborne Applications ApplicationsOTHER The Demonstrator will consider Middleware Architectural Layers SWIM-SUIT will not focus on: –Air/Ground Datalink issues –Operational Requirement Definition Activities

11 14/05/2008 Brussels, AP4 Workshop Project Details RTD project (STREP) Call 4b of the 6FP Budget: 11,8 M 6,3 M funded by EC

12 14/05/2008 Brussels, AP4 Workshop Consortium at a Glance 10 Countries 20 Partners 6 Industries 1 Airport Managing Company 2 Airlines 4 ANSPs 4 SMEs 2 Research Centres 1 University External support from: User Group

13 14/05/2008 Brussels, AP4 Workshop The Road to SWIM-SUIT: User Group Requirements Design Integration Validation Financial WP0 WP1 Information Management Users Requirements WP2 SWIM Design, Development and Testing WP3 Test Bed Integration and Testing WP4 Validation WP5 Financial and Institutional EC European Commission

14 14/05/2008 Brussels, AP4 Workshop The Road to SWIM-SUIT: User Group Requirements Design Integration Validation Financial WP0 WP1 Information Management Users Requirements WP2 SWIM Design, Development and Testing WP3 Test Bed Integration and Testing WP4 Validation WP5 Financial and Institutional EC European Commission User Group

15 14/05/2008 Brussels, AP4 Workshop SWIM SUIT: PLANNING Requirements Design Integration Validation Financial

16 14/05/2008 Brussels, AP4 Workshop SWIM SUIT: PLANNING Requirements Design Integration Validation Financial 1234123412341234 2007200820092010 WP1 WP2 WP3 WP4 WP5 1 st Cycle2 nd Cycle

17 14/05/2008 Brussels, AP4 Workshop SWIM SUIT: Inputs and Positioning SESAR Definition phase 2006200720082009 SESAR Implementation phase SWIM SUIT D1 D2 D3 D4 D5 D6 FOIPS OATA ICOG FAA SWIM NEW SKY CAATS II OATA MCS CFMU FOS

18 14/05/2008 Brussels, AP4 Workshop What are we offering today WP1 Information Management Users Requirements WP2 SWIM Design, Development and Testing WP3 Test Bed Integration and Testing WP4 Validation WP5 Financial and Institutional Today Immediate future D.1.2.1: Information Content & Services Requirements D.1.3.1: Preliminary FHA report D.1.4.1: Information Security Requirements D.2.2: Report on candidate technology and service options D.1.5.1: Overall SWIM Users Requirements D.1.6.1: SWIM Prototype Requirements D.2.3.1: Information Model and Services

19 14/05/2008 Brussels, AP4 Workshop Where to find them… http://www.swim-suit.aero/swimsuit/


Download ppt "14/05/2008 Brussels, AP4 Workshop SWIM-SUIT Giuliano dAuria SELEX Sistemi Integrati."

Similar presentations


Ads by Google