Download presentation
Presentation is loading. Please wait.
Published byMárk Mészáros Modified over 5 years ago
1
ISD SG Closing Report Date: 2012-07-19 Authors: July 2012 July 2012
doc.: IEEE /0960r2 July 2012 ISD SG Closing Report Date: Authors: Stephen McCann, RIM Stephen McCann, RIM
2
July 2012 doc.: IEEE /0960r2 July 2012 Abstract Closing report for Infrastructure Service Discovery Study Group (ISD SG) for July 2012, San Diego, CA, USA Stephen McCann, RIM Stephen McCann, RIM
3
Summary Plans for September 2012
July 2012 doc.: IEEE /0960r2 July 2012 Summary Name change – Pre-Association Discovery (PAD) Several presentations on use cases and requirements Extensive discussion on scope, resulting in a draft scope suitable for a PAR. Minutes: r0 A motion to extend the study group No teleconferences Plans for September 2012 Editing of the PAR and 5C documents Stephen McCann, RIM Stephen McCann, RIM
4
January 2012 doc.: IEEE /0960r2 July 2012 Motion Request the IEEE 802 LMSC to extend the IEEE PAD Study Group. Note: this is to allow further work to finalise PAR and 5 Criteria documentation. Moved: Harry Worstell Second: Dwight Smith Result: 29/0/0 Stephen McCann, RIM Michael Montemurro, RIM
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.