Download presentation
Presentation is loading. Please wait.
Published byRaina Darbyshire Modified over 10 years ago
1
Presented to: By: Minh Nguyen, Ph.D, Program Manager Date: Federal Aviation Administration SWIM/SWIM-SUIT Interoperability Demonstration Demonstration and Prototyping Information Exchange Briefing May 26, 2010
2
2 Federal Aviation Administration SWIM/SWIM-SUIT Interoperability Demonstration May 26, 2010 2 Description Conduct interoperability demonstration between the Boeing ATM test bed in Chantilly, Virginia with the Boeing Research and Technology Europe (BR&TE) SWIM-SUIT prototype test bed in Madrid, Spain Envisioned to facilitate international communications, collaboration, and coordination by initiating interoperability demonstrations
3
3 Federal Aviation Administration SWIM/SWIM-SUIT Interoperability Demonstration May 26, 2010 3 Description – Interoperability Architecture ASDI XML Surveillance European Surveillance In ASDI XML ASDI Surveillance in CAT62 XML European Surveillance In CAT62 XML Harmony WAN Chantilly SWIM-SUIT Harmony Bridge Harmony Bridge Mediation Service SWIM Box Mediation Service FAA Madrid Correlator Daytona Beach FL Kent, WA Potential Publishers / Subscribers ISPOC ATSU-AMAN Rome Area Control Center LISATM CFMU Lido Airline Operational Center Air France Airline Op. Center Heathrow Airport CDM Boeing 747 Simulator Boeing 737 FMS
4
4 Federal Aviation Administration SWIM/SWIM-SUIT Interoperability Demonstration May 26, 2010 4 March 2010 US-Europe SWIM Interoperability 4 Description - SWIM-SUIT Overview ISPOC Prototype ATFCM (CFMU) ACC/APP ACC AOC Flight Simulator FMS EAD USA Acquire Data MXP AIRPORT Heathrow A-CDM
5
5 Federal Aviation Administration SWIM/SWIM-SUIT Interoperability Demonstration May 26, 2010 5 Key Players FAA –ATO-W: SWIM Program office –ATO-P: Advanced Technology Development & Prototyping Group –International Office: Europe, Africa and Middle East Group European Commission SELEX Boeing –Boeing Research and Technology Europe (BR&TE) –Boeing (Chantilly, Va)
6
6 Federal Aviation Administration 6 Major Milestones/Goals TASKQuarter 1Quarter 2Quarter 3Quarter 4 Kick-off Meeting 3/11 Demonstration Plan / Procedures 5/11 Demonstration 6/24 - 6/25 TIM 3/17 Final Report 9/2 FY10
7
7 Federal Aviation Administration SWIM/SWIM-SUIT Interoperability Demonstration May 26, 2010 7 Major Milestones/Goals Interoperability Demonstration –Transfer flight plan and surveillance data (ASDI) between the Boeing ATM testbed network and the SWIM-SUIT network via virtual private network –Boeing ATM testbed network will use nodes in Chantilly, VA, Kent, WA, and Daytona Beach, FL (Embry Riddle Aeronautical University) –SWIM-SUIT network has nodes at BR&TE in Madrid, Spain and other nodes in European countries such as England, France, Italy, and Portugal
8
8 Federal Aviation Administration SWIM/SWIM-SUIT Interoperability Demonstration May 26, 2010 8 Accomplishments To Date Contract award – April 1, 2010 –Letter authorizing Boeing to proceed on the SWIM/SWIM-SUIT task during an initial pre-task period – March 8, 2010 Conducted Kick-off Meeting – March 11, 2010 Conducted TIM at Madrid, Spain – March 17, 2010 Begin to coordinate bi-weekly meetings to prepare for demonstration –TIM in Brussels on May 25-26 –International telecon being coordinated
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.