Presentation is loading. Please wait.

Presentation is loading. Please wait.

Offsite Applications for Rail Overbuild Part 2 Royal Mint Gardens

Similar presentations


Presentation on theme: "Offsite Applications for Rail Overbuild Part 2 Royal Mint Gardens"— Presentation transcript:

1 Offsite Applications for Rail Overbuild Part 2 Royal Mint Gardens
19 July 2018

2 Royal Mint Gardens London
Case Study Royal Mint Gardens London DLR Line Encapsulation

3 Precast Specialists You Can Trust
Proposed Development Full precast solution CORRIB ONSHORE PIPELINE

4 Method Statement and Actual Installation of the Precast Walls
Precast Specialists You Can Trust Method Statement and Actual Installation of the Precast Walls Full precast solution Safety by Design CORRIB ONSHORE PIPELINE

5 Precast Specialists You Can Trust
Bespoke precast walls – installed beside live rail line in central London Full precast solution CORRIB ONSHORE PIPELINE

6 Restrictive site central London
Precast Specialists You Can Trust Restrictive site central London

7 Restrictive site central London
Precast Specialists You Can Trust Restrictive site central London

8 Installation Complete
Precast Specialists You Can Trust Installation Complete Full precast solution CORRIB ONSHORE PIPELINE

9 Encapsulation Inspection by
Precast Specialists You Can Trust Encapsulation Inspection by Network Rail Full precast solution CORRIB ONSHORE PIPELINE


Download ppt "Offsite Applications for Rail Overbuild Part 2 Royal Mint Gardens"

Similar presentations


Ads by Google