1 LERF Readiness Review Homework
Bob Legg Accel Operations Sept 30, 2015

2 HOMEWORK CONCERNS Give the name and expiration dates for all relevant Work Control Documents Give a list of the LERF sub-system owners Name all LERF Scientist-on-Shift’s Provide a list of all items removed from LERF during the 2.5 year hiatus Give more details on the procedures to be used during Commissioning run 4/30/2019

3 Work Control Documents
Good shape on LOSP’s for October run. No current maintenance OSPs for rf 4/30/2019

4 List of System owners Still some negotiations concerning who is Owner of some systems; e.g. Picomotors on ADL optical transport, Gun or ICN groups? 4/30/2019

5 List of Parts Removed Only a few items known to have been removed from FEL during hiatus. Hot Check Out process identified most of those 4/30/2019

6 Procedures Rather than rushing a set of procedures through the MCC review, a more appropriate approach would be to break Steve’s Meta procedure into a set of Beam Test Plans to which Procedures of any type can be appended. Run the Beam Test Plans through the Standard Approval Process. This has the added advantage of getting CASA involved. Beam test plans are already part of the process written into the LOD. Once the process is proven to work, THEN you turn it into a procedure that meets the MCC standards. This has worked well for CEBAF, and I think it will also work for the LERF. 4/30/2019