Presentation is loading. Please wait.

Presentation is loading. Please wait.

IEEE MEDIA INDEPENDENT HANDOVER

Similar presentations


Presentation on theme: "IEEE MEDIA INDEPENDENT HANDOVER"— Presentation transcript:

1 IEEE 802.21 MEDIA INDEPENDENT HANDOVER
DCN: Title: Liaison Report for Date Submitted: July 21, 2011 Contributed to IEEE on July 21, 2011 Authors or Source(s):   Clint Chaplin, Liaison (Samsung) Abstract: This document is the liaison report on

2 IEEE 802.21 presentation release statements
This document has been prepared to assist the IEEE Working Group. It is offered as a basis for discussion and is not binding on the contributing individual(s) or organization(s). The material in this document is subject to change in form and content after further study. The contributor(s) reserve(s) the right to add, amend or withdraw material contained herein. The contributor grants a free, irrevocable license to the IEEE to incorporate material contained in this contribution, and any modifications thereof, in the creation of an IEEE Standards publication; to copyright in the IEEE’s name any IEEE Standards publication even though it may include portions of this contribution; and at the IEEE’s sole discretion to permit others to reproduce in whole or in part the resulting IEEE Standards publication. The contributor also acknowledges and accepts that this contribution may be made public by IEEE The contributor is familiar with IEEE patent policy, as stated in Section 6 of the IEEE-SA Standards Board bylaws < and in Understanding Patent Issues During IEEE Standards Development

3 802.11 Groups 802.11s – Mesh Networking
802.11mb – New Maintenance group (compilation of all approved amendments) Currently finishing changes that could not be completed in time for 802.11aa - Video Transport Streaming Additions to support video 802.11ac – Very High Throughput <6GHz Successor to n at frequencies less than 6GHz 802.11ad – Very High Throughput 60GHz Successor to n at 60GHz 802.11ae – QoS MAN QoS of Management frames 802.11af – TVWS TV White Space 802.11ah – Sub-1GHz Sub-1GHz Operation 802.11ai – Fast Link Setup Speed up initial link setup

4 802.11 TGmb 802.11 Accumulated Maintenance Changes
Second Recirculation Sponsor ballot on IEEE mb D8.0 closed April 14, Results: 136/12/ % 863 comments received: 301 technical, 522 editorial, 40 general Resolved all of the comments Third Recirculation Sponsor ballot on IEEE mb D9.0 closed June 22, Results: 139/11/ % 216 comments received: 90 technical, 115 editorial, 11 general Resolved all of the comments ??? Going out for Fourth Recirculation Sponsor ??? Dorothy Stanley (needs to be updated)

5 Theodorus (Dee) Denteneer
TGs Mesh Networking Third Recirculation Sponsor Ballot on IEEE s D10.0 closed April 9, Results: 140/5/0/ % 246 comments received: 164 technical, 78 editorial, 4 general Resolved all comments Fourth Recirculation Sponsor Ballot on IEEE s D11.0 closed May 7, Results: 140/5/0/ % 300 comments received: 133 technical, 165 editorial, 2 general Fifth Recirculation Sponsor Ballot on IEEE s D12.0 closed June 4, Results: 141/4/0/ % (two voters change from “no” to “yes” after ballot closed: 143/2/0/9) 1 comment received Asking the EC Friday for unconditional approval to publish Theodorus (Dee) Denteneer

6 802.11 TGaa 802.11 Video Transport Streams
Third Recirculation WG Ballot LB175 on draft 4.0 closed April 9, Results 135/23/ % 802.11aa received 93 comments, 70 technical and 23 editorial, and the BRC addressed all comments. Fourth Recirculation WG Ballot LB179 on draft 5.0 closed June 17, Results 142/15/ % 802.11aa received 132 comments, 70 technical and 62 editorial, and the BRC addressed all comments. Planning on going out for recirculation after this meeting. Ganesh Venkatesan stepped down as chair, a new chair will be selected. Ganesh Venkatesan (needs to be updated)

7 802.11 TGac Very High Throughput <6GHz
First Initial WG Ballot LB178 on draft 1.0 closed June 25, Results 148/52/ %: failed 802.11ac received 1821 comments, 1031 technical, 766 editorial, and 24 general, and the BRC is addressing the comments. Planning on going out for Second Initial WG ballot in September or November Osama Aboul-Magd

8 802.11 TGad Very High Throughput 60GHz
First Recirculation WG Ballot LB174 on draft 2.0 closed April 4, Results 175/25/ % 802.11ad received 330 comments, 198 technical and 132 editorial, and the BRC has addressed all comments. Elected Chris Hansen as Vice-Chair (previous Vice-Chair stepped down) Second Recirculation WG Ballot LB177 on draft 3.0 closed June 1, Results 188/16/ % 802.11ad received 214 comments, 133 technical and 81 editorial, and the BRC has addressed ???. Will to go out for Third Recirculation WG ballot ???? Eldad Perahia (needs to be updated)

9 TGae QoS MAN Second Recirculation WG Ballot LB176 on draft 3.0 closed April 26, Results 163/21/ % 802.11ae received 142 comments, 58 technical and 84 editorial, and the BRC addressed all the comments. Third Recirculation WG Ballot LB180 on draft 4.0 closed June 18, Results 180/8/ % 802.11ae received 77 comments, and the BRC addressed all the comments. Already started Fourth Recirculation WG ballot; ends August 4. Asking the EC Friday for conditional approval to go out for Sponsor Ballot. Michael Montemurro 9

10 Rich Kennedy (needs to be updated)
TGaf TV White Space May Settled on architecture and security modifications to track regulatory changes Selected P802.11ac as PHY focus Adjusted timeline accordingly Resolved 481 comments 408 of 410 Editorial (accepted into draft 1.01) 73 of 892 Technical (voted Thursday AM2) Revised the P802.11af timeline Planned for July ad hoc, and weekly teleconferences Still begin Tuesdays at 22:00 ET July Rich Kennedy (needs to be updated) 10

11 Dave Halaz (needs to be updated)
TGah Less than 1GHz May 2011 Worked on Channel model document General agreement on outdoor channel model Discussions on indoor channel Have not yet reached agreement on document Requirements and evaluation methodology started Still need to make progress on Requirements and Evaluation Methodology Change of leadership roles Yongho Seok: Vice Chair Minyoung Park: Editor Secretary is open Dave Halaz (needs to be updated) 11

12 802.11 TGai Fast Initial Authentication
May 2011 Reviewed and Approved the Singapore and Teleconference meeting minutes Approved Use Case Scenario documentation Approved TGai requirement documentation Approved Process for creating TGai draft Approved Weekly Teleconference schedule Approved Plan for July Discussion and approve Evaluation methodology Submission of Initial technical contribution General submission Submission of Presentation 0619/00 Use case: network mobility / Jihyun Lee (LG Electronics) 0746/00 Discussion on How Many APs to Cover/ Dwight Smith (Motorola Mobility) 0238/17 Use-Case-Reference-List-for-TGai / Tom Siep (CSR) 0750/01 Use-Case-Document-Definitions /Tom Siep (CSR) 0739/01 HIP DEX for Fast Initial Authentication in /Konstantinos Georgantas, (Helsinki Institute for Information Technology) 0756/00 IP address assignment in FIA/ Robert Moskowitz (Verizon) 0797/00 Use Case: Mobile hotspot / Jhyun Lee (LG) 0745/05 TGai Functional Requirements / Marc Emmelmann (Fraunhofer FOKUS & Root ) 0748/04 process-for-Creating-TGai-Draft / Tom Siep (CSR) Hiroshi Mano (needs to be updated) 12

13 802.11 WNG Wireless Next Generation SC
Two presentations at May 2011 meeting WNG Presentation: 6-9GHz extensions to ( wng-6-9ghz-extensions-to ppt) – Jim Lansford DSA system for 2.4GHz ISM Band ( wng-dsa-system-for-2-4ghz-ism-band.pptx) – Shoichi Kitazawa Three presentations at July 2011 meeting Improving the Case for Wireless LAN Transmit Power Control— including to better service Mobile Telephones? ( wng-improving-tpc-case.ppt) – Lawrence Zuckerman Channel Contention with a Large Number of Devices ( wng-channel-contention-with-a-large-number-of-devices.ppt) – Ed Reuss PTC Radio and System Architecture ( wng-positive-train-control-radio-and-system-architecture.ppt) – Jia-Ru Li Clint Chaplin

14 JTC1/SC6 Ad-Hoc ISO/IEC JTC1/SC6
May 2011 July 2011 Andrew Myles (needs to be updated)

15 Rich Kennedy (needs to be updated)
Regulatory Ad-Hoc May 2011 Discussed regulatory summaries from North America, the EU and Asia FCC TVBD test plan issues Update on 5 GHz TDWR activities Received Draft Spectrum Allocation plan from India Generated input on P802.11af for information document to ITU-R Rich Kennedy (needs to be updated)


Download ppt "IEEE MEDIA INDEPENDENT HANDOVER"

Similar presentations


Ads by Google