GLAST Large Area Telescope:
Gamma-ray Large Area Space Telescope GLAST Large Area Telescope: TKR NRL Hiro Tajima (SLAC) TKR
2
From Previous Efficiency Trending
Some layers (Bay 3 Y6, Bay 5 X14, Bay 5 Y12, Bay 6 Y3, Bay 7 Y16, Bay 8 X11, Bay 8 X7) showed non-negligible efficiency drop. No apparent cause (dead, disconnected or hot strips, noise flare). Add more runs between and Lower minimum duration limit to 500 seconds.
3
When efficiency drop started?
Efficiency drop started between run# (5/29) and (6/1). Common cause? Vibe Z axis performed on 5/31. Michael Kuss found no issue with TKR tower internal alignment. No change in TKR related register values Bay 3 Y6 Bay 5 X14 Bay 6 Y3 Bay 5 Y12 Bay 7 Y16 Bay 8 X11 Bay 8 X7
4
More Efficiency Loss More layers with similar efficiency loss
Total 39 layers were affected. Some layers fully recovered. Some layers recovered half way. Some layers no receovery.
5
TKR Muon Peak Trending Charge scale: muon peak normalized to expected MIP peak. Requires 4 hours of muon data. Mean value of muon peak has been drifting since last TOT calibration performed on 4/19. Spread of muon peak is also increasing. Requested new TOT calibration. mean RMS