Download presentation
Presentation is loading. Please wait.
1
802.11 Arc Standing Committee
July 2008 doc.: IEEE /0xxxr0 July 2008 Arc Standing Committee Date: Authors: David Bagby, Calypso Ventures, Inc. David Bagby, Calypso Ventures, Inc.
2
Agenda and working document
July 2008 doc.: IEEE /0xxxr0 July 2008 Abstract Agenda and working document for ARC SC, July 2008, Denver. David Bagby, Calypso Ventures, Inc. David Bagby, Calypso Ventures, Inc.
3
IEEE P802.11 Architecture Committee
July 2008 IEEE P Architecture Committee Agenda & working document for July 2008 sessions. David Bagby, Calypso Ventures, Inc.
4
July 2008 doc.: IEEE /0xxxr0 July 2008 Arc Agenda – July 2008 Admin Attendance Policies Meeting goals Focused discussion topic: MAC block diagrams Ref this document Doc 08/xxxx (Darwin Engwer, Nortel) Q&A David Bagby, Calypso Ventures, Inc. David Bagby, Calypso Ventures, Inc.
5
Attendance Reminder to attendees to sign in for .11 attendance credit
July 2008 Attendance Reminder to attendees to sign in for .11 attendance credit David Bagby, Calypso Ventures, Inc.
6
IP policy A SC is covered by the WG IP policy announcements.
July 2008 IP policy A SC is covered by the WG IP policy announcements. Even though we don’t have to read the policy to SC attendees, all attendees are reminded that the policies are in effect and apply to SC sessions. David Bagby, Calypso Ventures, Inc.
7
Arc SC – Meeting Goals Short recap of May session
July 2008 doc.: IEEE /0xxxr0 July 2008 Arc SC – Meeting Goals Short recap of May session Revision of project mixture to include both existing and “future needs” activity. Focused Discussion Topic MAC block diagrams (mixed time frames) Existing 2007 std Current TG impacts Exploratory future looking discussion What’s “upper” and “lower”? David Bagby, Calypso Ventures, Inc. David Bagby, Calypso Ventures, Inc.
8
The 802.11 Arc Standing Committee: Mission
July 2008 The Arc Standing Committee: Mission Established by the new WG Chair as a Standing Committee in May 2008 Mission: The Arc group is tasked to discover, analyze, codify, and promote a common understanding of architecture. Discover: To notice or learn, especially by making an effort; Archaic To reveal or expose; Analyze: To separate (a material or abstract entity) into constituent parts or elements; determine the elements or essential features of; Codify: To arrange or systematize; Promote: To help or encourage to exist or flourish; The Arc team utilizes members with significant expertise, experience, and history within David Bagby, Calypso Ventures, Inc.
9
Arc: Initial Activities (May 2008)
July 2008 Arc: Initial Activities (May 2008) 1) What is the Architecture as of ? Stick strictly to “what it is”, not “what do we wish it was”. 2) What will the Arc impacts of current TG activities? 3) Work with SGs; which portions of Architecture they are modifying? 4) Contact point for architecture liaison topics. David Bagby, Calypso Ventures, Inc.
10
Arc: Initial Activities (Feedback from May 2008)
July 2008 Arc: Initial Activities (Feedback from May 2008) Attendees expressed desire to for the project mix to be multiple, smaller, shorter duration tasks. Include more “forward looking” activity A suggested forward looking example: VHT ”MAC split / reuse” David Bagby, Calypso Ventures, Inc.
11
July: A smaller topic, for a mixed look at history and future needs
Instead of starting on project 1 (analysis of existing architecture) from May, we are going to take a single, limited architectural “chunk” topic and explore What is it in the 2007 std? (May Project 1 aspect) How will current activities impact it? (May Project 2 aspect) SG/future future needs? (May project 3 aspect + extapolations) Driven by a specific example question David Bagby, Calypso Ventures, Inc.
12
Division of Topic over Arc Sessions
July 2008 Division of Topic over Arc Sessions Arc Session 1 2007 status Current .11 activities impact Arc Session 2 Current .11 activities impact – cont. Possible future needs David Bagby, Calypso Ventures, Inc.
13
Discussion Topic Ground Rules
July 2008 Discussion Topic Ground Rules We are exploring - Small group, open, honest dialog There is no “right” or wrong”, we’re seeking shared understanding, (any debating points “scored” are not redeemable…) Session is not oriented toward being a tutorial, discussion presumes familiarity with 2007 contents. David Bagby, Calypso Ventures, Inc.
14
July Topic: Mac block diagrams
Specific discussion questions: What’s inside the block? What’s “upper” and “lower”? Existing from 2007 std Current activity impacts (not in 2007) Exploratory future looking discussion David Bagby, Calypso Ventures, Inc.
15
MAC block diagram discussion
July 2008 MAC block diagram discussion 2007 Some MAC diagrams from 2007 std Existing TG impacts To be fleshed out via interactive discussion SG/Future needs: What is “Upper” and “Lower”? Presentation 08/xxx – Darwin David Bagby, Calypso Ventures, Inc.
16
July 2008 Diagrams David Bagby, Calypso Ventures, Inc.
17
July 2008 2007 figure 5-3 David Bagby, Calypso Ventures, Inc.
18
2007 figure 5-3 There are .11 MAC “blocks” at these locations…
July 2008 2007 figure 5-3 There are .11 MAC “blocks” at these locations… There are MAC “blocks” at these locations… There are MAC “blocks” at these locations… There are MAC “blocks” at these locations… David Bagby, Calypso Ventures, Inc.
19
..and here in this diagram…
July 2008 2007 Figure N-4 ..and here in this diagram… David Bagby, Calypso Ventures, Inc.
20
July 2008 2007 figure 10-1 David Bagby, Calypso Ventures, Inc.
21
This session, we are exploring inside this region…
July 2008 2007 figure 10-1 This session, we are exploring inside this region… David Bagby, Calypso Ventures, Inc.
22
Some “internal MAC blocks”…
July 2008 2007 figure 9-1 Some “internal MAC blocks”… David Bagby, Calypso Ventures, Inc.
23
One concpet for “what’s inside”
July 2008 One concpet for “what’s inside” Doc 08/xxx (Darwin Engwer) David Bagby, Calypso Ventures, Inc.
24
Current TG impact Diagrams
July 2008 Current TG impact Diagrams David Bagby, Calypso Ventures, Inc.
25
Current TG draft diagrams
July 2008 Current TG draft diagrams TG Picture Candidates (for group discussion during July) TGk (measurements) TGn (Hi thruput) TGp (wave) TGr (roaming) TGs (mesh) TGu (ext nets) TGv (net mgmt) TGw (protected mgt frames) TGz (DLS) TGaa (Video) Others? David Bagby, Calypso Ventures, Inc.
26
July 2008 Future Needs Exercise David Bagby, Calypso Ventures, Inc.
27
“Perceived future need”
July 2008 “Perceived future need” VHT sessions have talked loosely about “upper” and “lower” MAC…. What is that? David Bagby, Calypso Ventures, Inc.
28
Discussion experiment feedback
July 2008 Discussion experiment feedback Good or bad approach? What aspects to pursue between July and Sept? David Bagby, Calypso Ventures, Inc.
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.