Presentation is loading. Please wait.

Presentation is loading. Please wait.

IEEE Regulatory SC Geneva DRAFT Meeting Plan and Agenda

Similar presentations


Presentation on theme: "IEEE Regulatory SC Geneva DRAFT Meeting Plan and Agenda"— Presentation transcript:

1 IEEE 802.11 Regulatory SC Geneva DRAFT Meeting Plan and Agenda
April 2009 doc.: IEEE /xxxxr0 July 2013 IEEE Regulatory SC Geneva DRAFT Meeting Plan and Agenda Date: Authors: Rich Kennedy, BlackBerry Rich Kennedy, Research In Motion

2 April 2009 doc.: IEEE /xxxxr0 July 2013 Abstract This presentation is the plan for the IEEE Regulatory Standing Committee meeting at the Geneva IEEE 802 Plenary the week of July 15, 2013. Rich Kennedy, BlackBerry Rich Kennedy, Research In Motion

3 Agenda [TAM2+PM2, WPM2] Assign a recording secretary
July 2013 Agenda [TAM2+PM2, WPM2] Assign a recording secretary Administrative items Required notices Introduction Approve meeting and teleconference minutes The regulatory summaries Action items and issues NPRM FCC response NPRM FCC response Coexistence with ITS / DSRC discussion Adjourn Rich Kennedy, BlackBerry

4 Administrative Items Required notices Chair and Secretary
July 2013 Administrative Items Required notices Affiliation FAQ - Anti-Trust FAQ - Ethics - IEEE Working Group Policies and Procedures - Chair and Secretary Chair is Rich Kennedy (BlackBerry) xxx. will act as Recording Secretary Rich Kennedy, BlackBerry

5 SC Operating Rules Anybody can vote, present, and make motions
May 2012 doc.: IEEE /0675r0 July 2013 SC Operating Rules Anybody can vote, present, and make motions Participation in SC during WG Plenary or Interim counts towards voting rights All motions must pass by a 75% majority Rich Kennedy, BlackBerry Clint Chaplin, Chair (Samsung)

6 Other Guidelines for IEEE WG Meetings
July 2013 Other Guidelines for IEEE WG Meetings All IEEE-SA standards meetings shall be conducted in compliance with all applicable laws, including antitrust and competition laws. Don’t discuss the interpretation, validity, or essentiality of patents/patent claims. Don’t discuss specific license rates, terms, or conditions. Relative costs, including licensing costs of essential patent claims, of different technical approaches may be discussed in standards development meetings. Technical considerations remain primary focus Don’t discuss or engage in the fixing of product prices, allocation of customers, or division of sales markets. Don’t discuss the status or substance of ongoing or threatened litigation. Don’t be silent if inappropriate topics are discussed … do formally object. See IEEE-SA Standards Board Operations Manual, clause and “Promoting Competition and Innovation: What You Need to Know about the IEEE Standards Association's Antitrust and Competition Policy” for more details. Rich Kennedy, BlackBerry

7 Introduction Outputs from this group must go through 802.18 Purpose
July 2013 Introduction Purpose Improve the working relationship between the technical experts and the regulatory specialists, especially when it comes to critical technical issues Scope The group will review new regulatory changes or impending changes affecting standards Each meeting will focus on the most critical issue at the time Critical Issue Focus Direct impact on IEEE current and future standards Response/Input deadlines Coordination with IEEE (RR-TAG) Coordination with the Wi-Fi Alliance Outputs from this group must go through Rich Kennedy, BlackBerry

8 Meeting and Teleconference Minutes
July 2013 Meeting and Teleconference Minutes Posted Minutes Waikoloa Wireless Interim: (posted 10-Jul :55:56) June 6th Teleconference: (posted 11-Jul :10:26) June 13th Teleconference: (posted 11-Jul :40:57) June 20th Teleconference: (posted 11-Jul :23:13) July 11th Teleconference: (posted 11-Jul :26:24) Rich Kennedy, BlackBerry

9 Motion #1 Motion: Moved by: Seconded by: Discussion on the motion?
July 2013 Motion #1 Motion: To approve the Regulatory SC minutes from the March Wireless Interim in Waikoloa, and June 6th, 13th, 20th and July 11th teleconferences in documents 11-13/621r0, 11-13/744r0, 11-13/745r0, 11-13/746r1 and 11-13/747r0 respectively. Moved by: Seconded by: Discussion on the motion? Vote: xx Y x N x A Rich Kennedy, BlackBerry

10 Regulatory Summary – North America
July 2013 Regulatory Summary – North America US NPRM FCC in Reply Comment period (slides 11) FNPRM/NOI FCC in comment period (slide 11) Canada IC developing TVWS standards (slide 12) Mexico Rich Kennedy, BlackBerry

11 Progress on Unlicensed Spectrum Changes
July 2013 Progress on Unlicensed Spectrum Changes NPRM FCC (59 pages) Opening 5350 to 5470 MHz and 5850 to 5925 MHz and resolving the TDWR interference mitigation issue Comment period closes May 28th Reply Comment period closes July 24th R&O/FNPRM/NOI FCC (202 pages) Reassessment of Federal Communications Commission Radiofrequency Exposure Limits and Policies Proposed Changes in the Commission's Rules Regarding Human Exposure to Radiofrequency Electromagnetic Fields Comment period closes September 3rd Reply Comment period closes November 1st Rich Kennedy, BlackBerry

12 Industry Canada TVWS Specifications
July 2013 Industry Canada TVWS Specifications RSS-222 Spectrum Management and Telecommunications Radio Standards Specification White Space Devices (WSDs) DBS-01 Spectrum Management and Telecommunications Database Requirements White Space (WS) Database Specifications Rich Kennedy, BlackBerry

13 Regulatory Summary – European Union
July 2013 Regulatory Summary – European Union European Commission ECC Report 200 Co-existence studies for proposed SRD and RFID applications in the frequency band MHz and MHz ETSI BRAN EN White Space Devices (WSD); Wireless Access Systems operating in the 470 MHz to 790 MHz frequency band; Harmonized EN covering the essential requirements of article 3.2 of the R&TTE Directive Now at v1.0.0 – out for approval Ofcom Beginning TVWS trials ( Rich Kennedy, BlackBerry

14 Regulatory Summary - Asia
July 2013 Regulatory Summary - Asia Rich Kennedy, BlackBerry

15 NPRM FCC 13-22 Comments (Proceeding FCC 13-49)
July 2013 NPRM FCC Comments (Proceeding FCC 13-49) Comment period closed May 28th NPRM in (key phrases highlighted) Comments outline in Draft Comments in Final Comments in Rich Kennedy, BlackBerry

16 NPRM FCC 13-22 Reply Comments
July 2013 NPRM FCC Reply Comments FCC received Comments survey in Reply Comments framework in Reply Comments draft in Rich Kennedy, BlackBerry

17 FCC 13-22 Reply Comments Plan
July 2013 FCC Reply Comments Plan Complete the work on the FCC Reply Comments Vote to approve and send to the RR-TAG Rich Kennedy, BlackBerry

18 July 2013 Motion #2 Motion: To approve document 11-13/0671r3, “FCC Reply Comments” as the IEEE input to with the intention of approval by the RR-Tag and ExCom and submittal to the FCC on or before July 24, 2013. Moved by: Seconded by: Discussion? Results: xx Y x N x A Rich Kennedy, BlackBerry

19 Response to Ofcom Consultation
July 2013 Response to Ofcom Consultation Licence Exempt spectrum use in the 2400 MHz band Consultation closes June 19th Rich Kennedy, BlackBerry

20 Teleconferences Weekly on Thursdays, 12:30 to 14:00 ET July 2013
Rich Kennedy, BlackBerry

21 References July 2013 NPRM FCC 13-22
Industry outline for NPRM FCC response NPRM FCC Dissected FCC Comment Framework FCC Comments FCC Comments survey FCC Reply Comments framework FCC draft Reply Comments Rich Kennedy, BlackBerry


Download ppt "IEEE Regulatory SC Geneva DRAFT Meeting Plan and Agenda"

Similar presentations


Ads by Google