Presentation is loading. Please wait.

Presentation is loading. Please wait.

Submission Title: [WG-TG3b Meeting Report September05]

Similar presentations


Presentation on theme: "Submission Title: [WG-TG3b Meeting Report September05]"— Presentation transcript:

1 Project: IEEE 802.15 Working Group for Wireless Personal Area Networks (WPANs)
Submission Title: [WG-TG3b Meeting Report September05] Date Submitted: [16September2005] Source: [John Barr] Company [Motorola] Address [1303 E. Golf Road, Schuamburg, IL 60196] Voice:[ ], FAX: [ ], Re: [ b-july-tg3b-agenda.xls] Abstract: [TG3b Chair Report to WG] Purpose: [TG3b chair report to WG to update them on all work items.] Notice: This document has been prepared to assist the IEEE It is offered as a basis for discussion and is not binding on the contributing individual(s) or organization(s). The material in this document is subject to change in form and content after further study. The contributor(s) reserve(s) the right to add, amend or withdraw material contained herein. Release: The contributor acknowledges and accepts that this contribution becomes the property of IEEE and may be made publicly available by

2 IEEE-SA Standards Board Bylaws on Patents in Standards
IEEE standards may include the known use of patent(s), including patent applications, provided the IEEE receives assurance from the patent holder or applicant with respect to patents essential for compliance with both mandatory and optional portions of the standard. This assurance shall be provided without coercion and prior to approval of the standard (or reaffirmation when a patent becomes known after initial approval of the standard). This assurance shall be a letter that is in the form of either a) A general disclaimer to the effect that the patentee will not enforce any of its present or future patent(s) whose use would be required to implement the proposed IEEE standard against any person or entity using the patent(s) to comply with the standard or b) A statement that a license will be made available without compensation or under reasonable rates, with reasonable terms and conditions that are demonstrably free of any unfair discrimination This assurance shall apply, at a minimum, from the date of the standard's approval to the date of the standard's withdrawal and is irrevocable during that period. Slide #1 Approved by IEEE-SA Standards Board – March 2003

3 Inappropriate Topics for IEEE WG Meetings
Don’t discuss licensing terms or conditions Don’t discuss product pricing, territorial restrictions or market share Don’t discuss ongoing litigation or threatened litigation Don’t be silent if inappropriate topics are discussed… do formally object. If you have questions, contact the IEEE Patent Committee Administrator at or visit Slide #2 Approved by IEEE-SA Standards Board – March 2003

4 Latest from IEEE-SA PatCom*
In regards to the presentation of information to a standards development group, PatCom has decided the following: After a patent letter of assurance (LoA) has been accepted by PatCom, it is allowable for a presenter to state that an LoA has been filed by a Patent Holder, accepted by PatCom, and listed in the online listing of LoAs at Anyone seeking a copy of the accepted LoA should contact the PatCom Administrator Discussion of the content of accepted, submitted, or proposed LoAs is prohibited Discussion of licensing terms and conditions is prohibited. *7Jan05 from David Ringle regarding message from Ray Hapeman, PatCom Chair

5 September 2005 Goals Review of sponsor ballot comments
Edit draft if necessary Prepare for sponsor ballot recirculation Hard work and heavy lifting

6 September 2005 Submissions
b-July-tg3b-agenda.xls b-next-pnc-identification.doc b-Meeting-Report-September05.ppt b-Sponsor-Ballot-comments.xls b-stp-changes.pdf b-meeting-minutes-September-05.txt P D03_Draft_Ammendment.pdf

7 Status Moving right along Sponsor ballot approved:
For % Against % Abstain 5 - 5% Total Voters % Comments: 244 (may have duplicates) 9 General 161 Editorial 74 Technical Will proceed with recirculation ballot following September session

8 Project Time Line Call for submissions – 3-2004
Accept and Review Submissions – 3:7-2004 Final submission approval – First amendment drafting – WG letter ballot – Forward to sponsor ballot – Sponsor ballot approved –

9 Comment Resolution Status
All technical comments have been resolved Agree - 12 Principle - 35 Disagree - 25 Out of Scope - 2 All but one General comment resolved Agree - 5 Principle - 1 Disagree - 3 Editorial comments will be handled by technical editor

10 Ballot Resolution Committee
John Barr, Chair James Gilb, Technical Editor Bill Shvodian Knut Odman

11 Recirculation Schedule
Complete editing of D04 - October 7 Task Group pre-ballot review - October 14 Pre-submission to REVCOM - October 17 Recirculation ballot - October 17 Review final comments and prepare for REVCOM submission - November Plenary REVCOM Review - December 5-7

12 Objectives for November 2005
Review recirculation ballot comments Edit draft if necessary Complete preparation for REVCOM approval Celebrate yet another success

13 Conference Call Schedule
None No ad-hocs scheduled See you in Vancouver, B.C.

14 TG3 Motion ?? Motion: Second: Vote: x/0/0

15 TG3 Motion ??? Motion: xx Second: xx Vote: x/0/0


Download ppt "Submission Title: [WG-TG3b Meeting Report September05]"

Similar presentations


Ads by Google