MSBA Feasibility Funding
Winthrop Elementary: Support our future Article 10: Winthrop Elementary MSBA Feasibility Funding 00 Winthrop Elementary MSBA Project: Building Schools We Can Be Proud Of
2
Winthrop Elementary: A Daily Challenge
01 Winthrop Elementary MSBA Project: Building Schools We Can Be Proud Of
3
Winthrop Elementary: A Daily Challenge
02 Winthrop Elementary MSBA Project: Building Schools We Can Be Proud Of
4
Winthrop Elementary: A Daily Challenge
03 Winthrop Elementary MSBA Project: Building Schools We Can Be Proud Of
5
Winthrop Elementary: A Daily Challenge
04 Winthrop Elementary MSBA Project: Building Schools We Can Be Proud Of
6
Winthrop Elementary: A Daily Challenge
05 Winthrop Elementary MSBA Project: Building Schools We Can Be Proud Of
7
Winthrop Elementary: A Daily Challenge
06 Winthrop Elementary MSBA Project: Building Schools We Can Be Proud Of
8
Winthrop Elementary: A Daily Challenge
07 Winthrop Elementary MSBA Project: Building Schools We Can Be Proud Of
9
Winthrop Elementary: A Daily Challenge
08 Winthrop Elementary MSBA Project: Building Schools We Can Be Proud Of
10
Winthrop Elementary: A Daily Challenge
09 Winthrop Elementary MSBA Project: Building Schools We Can Be Proud Of
11
Winthrop Elementary: A Daily Challenge
10 Winthrop Elementary MSBA Project: Building Schools We Can Be Proud Of
12
Winthrop Elementary: A Daily Challenge
11 Winthrop Elementary MSBA Project: Building Schools We Can Be Proud Of
13
Winthrop Elementary: A Daily Challenge
12 Winthrop Elementary MSBA Project: Building Schools We Can Be Proud Of
14
Winthrop Elementary: A Daily Challenge
13 Winthrop Elementary MSBA Project: Building Schools We Can Be Proud Of
15
Winthrop Elementary: A Daily Challenge
14 Winthrop Elementary MSBA Project: Building Schools We Can Be Proud Of
16
MSBA Process Feasibility Study How It Works and Who’s Involved
Winthrop Elementary: Support our future MSBA Process Feasibility Study How It Works and Who’s Involved 15 Winthrop Elementary MSBA Project: Building Schools We Can Be Proud Of
17
Collaboration for Better Schools
Winthrop Elementary: MSBA Collaborative Process Collaboration for Better Schools MSBA: Has been working with towns for 10+ years Financial Support Benefit to Town: Less waste, fewer delays and BETTER BUILDING 45% or more of total project costs 16 Winthrop Elementary MSBA Project: Building Schools We Can Be Proud Of
18
Winthrop Elementary: MSBA Process
Complete Complete Complete Complete Complete 17 Winthrop Elementary MSBA Project: Building Schools We Can Be Proud Of
19
Hire OPM and Design Team
Winthrop Elementary: Feasibility Process Steps: Hire OPM and Design Team Educational Program Initial Space Summary Assess existing school/infrastructure Site Assessment Develop / Evaluate Alternatives Schematic Design Benefit: Professionals with School Expertise Establish goals Determine Building Size Determine Scope: Renovate or New Determine where to Build Choose best option cost vs needs Initial Plans for School Who? SBC and MSBA Design Team OPM, Design Team, SBC, MSBA 18 Winthrop Elementary MSBA Project: Building Schools We Can Be Proud Of
20
Professionals Involved: Staff / Public Involved:
Winthrop Elementary: Feasibility Study Team Professionals Involved: OPM: Owners Project Manager Architect Engineering Consultants Educational Consultant What They Do: Oversees and manages project, advocates for town and provides a knowledge base to town Integrate educational program into design Integrate technology and green design features Ensure design accommodates all educational goals Staff / Public Involved: Teachers/Administration SBC - School Building Committee Town Boards Public What They Do: Shape design goals, educational program Oversees process; communicates with all parties; reviews and approves payments. Ensure uniformity in meeting Town goals Provide input for a design that meets everyone’s needs 19 Winthrop Elementary MSBA Project: Building Schools We Can Be Proud Of
21
Financing and Timeline
Winthrop Elementary: Support our future MSBA Process: Financing and Timeline 20 Winthrop Elementary MSBA Project: Building Schools We Can Be Proud Of
22
Arriving at Study Cost $945,000 $520,000 $627,000 to $933,000 $875,000
Winthrop Elementary: Today’s Financing Arriving at Study Cost $945,000 $520,000 $627,000 to $933,000 $875,000 $70,000 Estimated Total Cost of Ipswich Feasibility Study and Schematic Design Estimated Maximum Maximum Cost to Ipswich using %45 MSBA reimbursement True Cost of recent, similar scope studies, provided by MSBA Public Information True Cost of Woburn Study Isolated as most similar to Ipswich. Involved 2 existing schools Study looked at multiple Building Sites Budgeted Additional Scope Educational System Study Grade Splitting Analysis 21 Winthrop Elementary MSBA Project: Building Schools We Can Be Proud Of
23
Ipswich = $520,000max / MSBA = $425,000min
Winthrop Elementary: Today’s Financing Cost Breakdown Typical Fees - $575,000 $140,000 $160,000 Total - $875,000 Add Fees - $25,000 $45,000 Design Team Fees Architect Engineering Team Specialty Consultants Building Related OPM (Owners Project Manager) Fee Study Scope Unknowns (Hard to budget for all possible discoveries) Environmental, Traffic, Site, Hazardous Materials, Wetlands and Geotechnical studies Educational Consultant - School Model Study Educational Consultant - System Model Study Ipswich = $520,000max / MSBA = $425,000min 22 Winthrop Elementary MSBA Project: Building Schools We Can Be Proud Of
24
Funding Method BAN - If Article 10 Approved Feasibility Study Bond -
Winthrop Elementary: Today’s Financing Funding Method BAN - “Bond Anticipation Note” If Article 10 Approved Feasibility Study Bond - If School Building approved by town If School Building not approved or process halted Feasibility Study Funding - $520,000 Interest Only FY2016, 2017, 2018 $10,400 covered by School System No Levy, no tax increases Total Project Funding - FY2019 Absorbs $520,000 principal Covers Design and Construction Costs Required Dept Exclusion (Ballot Vote) Feasibility Principle Only Max $520,000 10 Yr Term $12 cost per household 23 Winthrop Elementary MSBA Project: Building Schools We Can Be Proud Of
25
Future Cost to Town Bond Retiring New School Bond
Winthrop Elementary: Today’s Financing Future Cost to Town Bond Retiring New School Bond Today’s Levi for Debt Future Levi With School Funding Town Has Multiple Bonds going OFFLINE $175K Library FY2019 $13.2M HS / MS FY2020 $1.4M Townhall FY2021 $4.3M Open Space Multiple Bonds FY2017, 2022, 2027, 2030 Estimated FY2017 School Cost - $43M-$47M Funding Model based on $50M %55 - $27.5M %45 - $22.5M FY $0.85 / $1000 Assessed FY $1.24 / $1000 FY $1.02 / $1000 FY $0.90-$0.85 / $1000 FY $0.81 / $1000 24 Winthrop Elementary MSBA Project: Building Schools We Can Be Proud Of
26
Date: Milestone: October 2014 Q1 2015 - Q1 2016 May 2016
Winthrop Elementary: Future Timeline Date: October 2014 Q Q1 2016 May 2016 June 2016 – Q2 2017 Q Q2 2019 September 2019 Milestone: Approval of funding: Feasibility study/SD only Feasibility Study / Schematic Design Vote: Full project funding Design Development / Construction Documents Construction Doors Open 25 Winthrop Elementary MSBA Project: Building Schools We Can Be Proud Of
27
A YES Vote on Article 10 WILL:
Winthrop Elementary: OCTOBER 21st TOWN MEETING A YES Vote on Article 10 WILL: Appropriate $945K for Feasibility Study/SD. Ipswich max cost: $520K Confirm Ipswich’s commitment to partner with MSBA Allow Ipswich to proceed with evaluating multiple design options It WILL NOT: Approve funding for a new school Bind the Town to the process; we can withdraw at any time Does not bind Ipswich to one option 26 Winthrop Elementary MSBA Project: Building Schools We Can Be Proud Of
28
Contact us with questions or to get involved!
Winthrop Elementary: Support our future Vote Yes on Article 10 Visit IpswichSBC.org Contact us with questions or to get involved! 27 Winthrop Elementary MSBA Project: Building Schools We Can Be Proud Of