Summer 2019 Construction Projects
Board Committee Meeting October 30, 2018 17:30
2
Agenda Debt Review District Financial Update
Ms. Lauren Stadel & Mr. Ken Phillips (RBC) Mr. Brad Remig (PFM) District Financial Update Dr. Richard Fry Mr. Richard Kerr District Strategic Plan / Profile of a Graduate / Glows Dr. Kevin Roberts 2019 Project Review / Prioritization Mr. Chris Barnett (CRA) Questions / Thoughts / Concerns
3
Debt Review Ms. Lauren Stadel & Mr. Ken Phillips (RBC)
Mr. Brad Remig (PFM)
4
Big Spring School District
Debt Review October 30, 2018 Ken Phillips Managing Director RBC Capital Markets 2101 Oregon Pike Lancaster, PA 17601 Tel: (717) Lauren Stadel Director RBC Capital Markets 2101 Oregon Pike Lancaster, PA 17601 Tel: (717) Brad Remig Managing Director Public Financial Management One Keystone Plaza, Suite 300 Harrisburg, PA 17101 Tel: (717)
5
Gross Debt
6
Net Debt
7
U.S. 10-Year Treasury in 2018
8
2017 Maximum Parameters Resolution for Capital Projects - $18,000,000
9
Hypothetical Issuance – Using entire remaining balance of 2017 parameters
10
Hypothetical Issuance – Using entire remaining balance of 2017 parameters
11
District Financial Update
Dr. Richard Fry Mr. Richard Kerr Construction / Debt $ Comparisons South Central Trust Funds General Fund Capital Projects Reserve Fund Master Project List (for future projects) Status of 2017 & 2018 Construction Bonds
12
Construction/Debt $ Comparison -- Total $ spent in 5000 accounts
Like Districts Construction/Debt $ Comparison -- Total $ spent in 5000 accounts Local Districts
14
South Central Trust Big Spring SD
15
Local Audit Worksheet South Central Trust
16
General Fund
18
Capital Projects Reserve Fund
19
Master Project List
20
Items Deleted from 2019 Construction
21
Estimated Remaining 2018 Project Payables
22
Project (Bond) Funds
23
District Strategic Plan Profile of a Graduate Glows
Dr. Richard Fry Dr. Kevin Roberts
24
System Alignment Direction = Compliance Accountability = Engagement
Direction = Engagement Accountability = Student Benefit & Community Based Accountability = Test Based Accountability = Test-based Aligning Accountability Programs with the Directional System
25
Attributes of a Big Spring Graduate
Within our Strategic Plan, we have had Attributes of a Big Spring Graduate. As written in the strategic plan, these attributes not only represent core beliefs, but what we believe our students need to be successful in a global economy.
26
Do these Attributes accurately reflect what it is that we want to develop and that we are delivering? DIC – Our charge was to analyze with our community whether those attributes “accurately reflected what we wanted to deliver from our BSSD program or experiences”
29
Attributes of a Big Spring Graduate
Each of these areas not only represent a summary of many thoughts, but also direct thoughts from our participants.
31
Looked at dominant themes in the survey and used those to analyze our current attributes
32
From this work and over the course of a couple District Improvement Committee Meetings, we were able to arrive at six Profile of a Graduate areas. We refer to these as the Six C’s
33
Newville Building Goals Mount Rock Building Goals Oak Flat Building Goals BSMS Building Goals BSHS Building Goals
34
SAT Data
35
SAT Data – Cont.
36
ACT Scores STATE ENGLISH MATHEMATICS READING SCIENCE COMPOSITE 2018
23.3 23.2 24.0 23.1 23.5
37
BSSD Ranked 448 2005 2018 BSSD Ranked 272
38
2019 Niche Best Schools Rankings
39
STEM – Background
40
Leveraging Our Buildings As Resources
46
2019 Project Review Dr. Richard Fry Mr. Richard Kerr Oak Flat Mt Rock
Middle School High School Summary 5-year Projection
47
Oak Flat Elementary STRATEGIC PLAN CONNECTIONS Healthy / Safe Schools
Door hardware, rekeying, and replacing exterior doors Server backup Lockdown system Cameras / Bells / Intercom Learning – 6C’s Renovation of Music Room Into LGI Creates equity among the three elementary buildings Swapping the two rooms provides for approximately 300 more square feet of space for multiple classes to use the same space at the same time
48
Mt Rock Elementary Healthy / Safe Schools
Communications to fitness center, stalls in locker room bathrooms, bell/intercom, cameras, PA system Learning / 6C’s Level LGI to convert to library Renovate existing library to LGI with purposeful spaces Modify layout of instructional coaches space to include space for intervention specialists
49
Middle School
50
High School
51
2019 Project Summary
52
Conclusion Remaining bond = $648,893
The District has sufficient reserves to cover 2019 construction without additional borrowing Remaining bond = $648,893
53
5-Yr Budget Projection Previous 5-year projection with 2019 bond
Previous 5-year projection – no bond
54
Questions?
Similar presentations