Roof Replacements and Associated Tuckpointing at SWRP & LASMA Project Buildings/Locations (10 Projects to be Completed over a Two Year Period) 2013 Projects: – Building #50, Aeration Battery C – Stickney WRP (SWRP) General Scope – Roof Replacement and Miscellaneous Concrete Repairs – Building #9015, Visitor Center - Lawndale Avenue Solids Management Area (LASMA) General Scope – Roof Replacement 4/12/20132
3
Roof Replacements and Associated Tuckpointing at SWRP & LASMA Project Buildings/Locations (10 Projects to be Completed over a Two Year Period) 2014 Projects: – Building #180, 52 nd Avenue Gate House - SWRP General Scope – Roof Replacement and Associated Tuckpointing/Sealing of Parapet Wall Limestone Coping Caps – Building #170, Main Foyer of West Side Pumping Station – SWRP General Scope – Roof Replacement – Building #21, Ejector Station D-1 – SWRP General Scope – Roof Replacement – Building #150, Imhoff Battery B, West Valve House – SWRP General Scope – Roof Replacement 4/12/20133
4
Roof Replacements and Associated Tuckpointing at SWRP & LASMA Project Buildings/Locations (10 Projects to be Completed over a Two Year Period) 2014 Projects (Cont): – Building #152, Imhoff Battery B, East Valve House - SWRP General Scope – Roof Replacement – Building #60, Effluent Disinfection Storage Building – SWRP General Scope – Roof Replacement and Associated Tuckpointing – Building #87, Scum Concentration – SWRP General Scope – Roof Replacement and Associated Tuckpointing – Building #9027, Racine Avenue Pumping Station (RAPS) General Scope – Roof Replacement and Associated Tuckpointing 4/12/20134
5
Building #50, Aeration Battery C - SWRP Bldg #50 Aerated Tanks Final Settling Tanks Note: The Contractor is responsible for preventing any demolition debris, construction material, tools, equipment, etc. from entering into the tanks. 4/12/20135
6
Building #50, Aeration Battery C - SWRP New System: Cold Applied Three (3) Ply SBS Modified Built-Up Asphalt Roofing System with River Washed Aggregate Estimated 175 Squares 4/12/20136
7
Building #9015, Visitor Center - LASMA 4/12/20137
8
Building #9015, Visitor Center - LASMA New System: Cold Applied Three (3) Ply SBS Modified Built-Up Asphalt Roofing System with a White, Reflective Energy Star rated Aggregate Surface Estimated 108.5 Squares Facing NE Facing SW 4/12/20138
9
Building #180, 52 nd Ave. Gate House - SWRP 4/12/20139
10
Building #180, 52 nd Ave. Gate House - SWRP New System: Cold Applied Three (3) Ply SBS Modified Built-Up Asphalt Roofing System with River Washed Aggregate Estimated 1.5 Squares 4/12/201310
11
Building #170, Main Foyer West Side Pumping Station - SWRP Project Area New System: Cold Applied Three (3) Ply SBS Modified Built-Up Asphalt Roofing System with River Washed Aggregate Estimated 1 Square 4/12/201311
12
Building #170, Main Foyer West Side Pumping Station - SWRP 4/12/201312
13
Building #21, Ejector Station D-1 - SWRP New System: Cold Applied Three (3) Ply SBS Modified Built-Up Asphalt Roofing System with River Washed Aggregate Estimated 1.5 Squares 4/12/201313
14
Building #21, Ejector Station D-1 - SWRP 4/12/201314
15
Building #150, Imhoff Battery B West Valve House - SWRP 4/12/201315
16
Building #150, Imhoff Battery B West Valve House - SWRP New System: Three (3) Ply Temporary Roofing System with River Washed Aggregate Estimated 19 Squares 4/12/201316
17
Building 152, Imhoff Battery B East Valve House - SWRP 4/12/201317
18
Building 152, Imhoff Battery B East Valve House - SWRP New System: Three (3) Ply Temporary Roofing System with River Washed Aggregate Estimated 19 Squares 4/12/201318
19
Building #60, Effluent Disinfection Storage Bldg. - SWRP 4/12/201319
20
Building #60, Effluent Disinfection Storage Bldg. -SWRP New System: Cold Applied Three (3) Ply SBS Modified Built-Up Asphalt Roofing System with River Washed Aggregate Estimated 6 Squares 4/12/201320
21
Building #87, Scum Concentration - SWRP 4/12/201321
22
Building #87, Scum Concentration - SWRP New System: Cold Applied Three (3) Ply SBS Modified Built-Up Asphalt Roofing System with River Washed Aggregate Estimated 43 Squares 4/12/201322 Lower RoofUpper Roof
23
Building #87, Scum Concentration - SWRP 4/12/201323
24
Building #9027, Racine Avenue Pumping Station Total Square Footage is Estimated at 330 Squares 4/12/201324 Northern Roof Penthouse Coarse Screen Addition
25
Building #9027, Racine Avenue Pumping Station New System: Northern Half of Bldg. will receive the Cold Applied Three (3) Ply SBS Modified Built-Up Asphalt Roofing System with a White, Reflective Energy Star rated Aggregate Surface 4/12/201325
26
Building #9027, Racine Avenue Pumping Station New System: The Penthouse will receive the Cold Applied Three (3) Ply SBS Modified Built-Up Asphalt Roofing System with a White, Reflective Energy Star rated Aggregate Surface 4/12/201326
27
Building #9027, Racine Avenue Pumping Station New System: The Coarse Screen Addition will receive the Cold Applied Three (3) Ply SBS Modified Built-Up Asphalt Roofing System with an Extensive Vegetative Roofing System incorporated on Top of the Overall Roofing Structure 4/12/201327
28
Roof Replacements and Associated Tuckpointing at SWRP & LASMA Contract #11-961-21 Note: The Metropolitan Water Reclamation District will not be responsible for any errors, omissions, or absence of any details within this presentation. The Contractor is responsible for thoroughly reviewing the entire contract package. The Contractor shall verify all dimensions, locations of work, conditions and other information specified herein, and be responsible for field verifying all the work required, and for the accuracy of all such information related to the work.