1 The 9th Collaboration Meeting
June 14-15, 2004, ANL LOI Status at ISIS ANL/ISIS/KEK Yoshiro Irie for the collaboration (JAERI/KEK) June 14-15, 2004, ANL The 9th Collaboration Meeting

2 Phasing of the LOI developments
Phase I April-September, 2004. Preparations at the MICE Hall: full peak power, but with a reduced duty factor Phase II Installation at the SP8 for the beam test in 2005(?) June 14-15, 2004, ANL The 9th Collaboration Meeting

3 The 9th Collaboration Meeting
June 14-15, 2004, ANL The 9th Collaboration Meeting

4 The 9th Collaboration Meeting
June 14-15, 2004, ANL The 9th Collaboration Meeting

5 The 9th Collaboration Meeting
June 14-15, 2004, ANL The 9th Collaboration Meeting

6 The 9th Collaboration Meeting
June 14-15, 2004, ANL The 9th Collaboration Meeting

7 The 9th Collaboration Meeting
Results to date Almost all the LOI equipments are in place. New RF contacts attached to the LOI chassis panels. June 14-15, 2004, ANL The 9th Collaboration Meeting

8 The 9th Collaboration Meeting
Forward The second harmonic cavity and the bias supply are to be moved in with a cooling unit. Power requirements 733KW-peak, 283KW-average Water requirements 238liter/min for high purity & demin water, and 38liter/min of a tapped water. Conductivity of the demin water that will be supplied to the MICE Hall is 1 microsiemens/cm. Cabling of power and control lines Pulsed grid supplies June 14-15, 2004, ANL The 9th Collaboration Meeting

9 The 9th Collaboration Meeting
Minimum power/water requirements at Phase I June 14-15, 2004, ANL The 9th Collaboration Meeting

10 The 9th Collaboration Meeting
Issues AC voltage variations at RAL? Japanese modules are usually safe for ±10% variation. Is the RAL 400Vac range safe for the voltage limit(35KV) of the input capacitor of the buck regulator?  probably yes (31.5KV×440/410=33.8KV). Work plan at the MICE Hall. Oil June 14-15, 2004, ANL The 9th Collaboration Meeting

11 The 9th Collaboration Meeting