Presentation is loading. Please wait.

Presentation is loading. Please wait.

PR deadline experiences, PCS UG

Similar presentations


Presentation on theme: "PR deadline experiences, PCS UG"— Presentation transcript:

1 PR deadline experiences, PCS UG
15th May 2018, Vienna

2 Issue Classification ➊ Minor ➋ Major ➌ Critical
Timetable quality issues in path requests could be organized by three categories ➊ Minor ➋ Major ➌ Critical Timetable mistakes: Defined dwell time with run through Defined different arrival/departure time with run through Train parameter mistakes Activity types Wrong RU – IM pairs Grey agencies as leading RU, thus dossiers got stuck in Harmonization or Feasibility Study Wrong offset due to not harmonized times on Borders Connecting PaP sections inside the territory Borders PaPs Wrong order of PaPs

3 Maintenance C-OSS during Pre-Booking:
Wrong parameters (activity types) on PaP locations Wrong dwell time values on PaP locations Not harmonized times on PaP locations (without calendar impact) PCS Support: Wrong RU – IM pairs Not harmonized times on any locations (unnecessary offset) with calendar impact Wrong dossier promotions


Download ppt "PR deadline experiences, PCS UG"

Similar presentations


Ads by Google