Download presentation
Presentation is loading. Please wait.
1
Roller Coaster Project
Get ready for a wild ride!
2
Letter from the Chief Executive Officer..
3
Roller coaster Project Breakdown
Roller Coaster Design (Group Grade-30 pts.)
4
Roller coaster Project Breakdown
Roller Coaster Design (Group Grade-30 pts.) Roller Coaster Blueprint (Group Grade-20 pts.) Design Rationale (Individual Grade-30 pts.) Advertisement (Group Grade- 20 pts.) Journal and Participation (Individual Grade- 20 pts.)
5
timeline May 30-31 intro, time to work on design and blueprint
SCHEDULE May intro, time to work on design and blueprint Design is due in class June 3/4 June 3/4 is a workday! June 6/7 you will have time to revisit design (first 40 min) June 6/7 you will present your coaster and turn in EVERYTHING!
6
BOTTOM LINE: EVERYTHING IS DUE ON JUNE 6/7!!
7
Before I let you go…. Let’s cut our tubing together
Today you need to brainstorm what other materials you can bring in to support the track of your coaster!
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.