Visalia WCP Trickling Filter Upgrade Project 1994/1995 Trickling Filters, Pump Station and Flow Control Box Modifications
2
VISALIA TF UPGRADE Project Manager - David Stringfield P.E. Design Engineer - Steve Beck P.E. Resident Engineer/Construction Manager - David Watson
3
Project Phases n New Effluent Distribution System u Junction Box A Rehabilitation u 54 Primary Effluent Pipeline Replacement u Flow Metering Manhole Construction u Butterfly Valve Control Box Retrofit n Trickling Filter Pump Station Retrofit n Overhaul of 2 180 Diameter Trickling Filters Mechanism and Structure
4
Junction Box A Rehabilitation n Box Rehabilitation. n Slide Gate Replacement n Wall Spool Renovation
5
Junction Box A Rehabilitation
6
Wall spool replacement.
7
New Stainless Steel Slide Gates Installation
8
Effluent Pipeline n Replace Effluent Pipeline n Construct New Manhole Meter Station n Install New Butterfly Valve n Construct New Wall Spool in TFPS
9
Replace Primary Effluent Pipeline
11
Replace Effluent Pipeline
12
Construct Metering Manhole Station
13
Install New 48 Butterfly Valve
14
Construct New Wall Spool TFPS
15
Trickling Filter Pump Station n Structural Rehabilitation n Install New Piping n Install New Pumps and VFD Units n Install New Stairway and Grating n Install New St Stl Slide Gates
16
Trickling Filter Rehabilitation n Demo Old Distributor Structures n Cut Filter Walls n Add Rebar Layers n Construct New Concrete Walls n Install New Channel Piers and Slabs n Install New Underdrain Block n Install New Plastic Media n Install New Distributors and VFD Units
17
Additional Construction Items n Pave Plant Site n Install New Light Fixtures n Install New Irrigation System n Install New Electrical Components