Download presentation
Presentation is loading. Please wait.
Published byLily Kinzey Modified over 10 years ago
1
Madison Elementary School District
2
Tonight's Topics 1- Energy Usage and Savings 2- Solar Update 3- Recent Projects 4- Spring and Summer Projects
3
Where do we use all that energy?
4
Lighting KW Consumption
5
Rebate, Energy and Ops Savings
6
Historic KW Consumption at Heights Elementary 09-10 18% 10-11 18% 11-12 4%
7
Where are we? Increased enrollment, rate hikes, abnormal weather patterns and the adding of MTA square footage all increased the need for energy. With all of that factored in, Madison still reduced energy costs by approximately $100,000 between FY09 and FY12. Continuation of Bond Program - another exciting summer of improvements which will further the Districts goal to reduce KW consumption.
8
Solar Locations at Madison # 1
10
Solar Locations at Rose Lane
11
Solar Locations at Park Elementary
12
Solar Structure Examples
13
Next Steps on Solar Execute PPA Issue Notice to Proceed: June 1, 2013 Achieve Commercial Operation: November 1, 2013 Enjoy 20 Years of Solar Savings!
14
Madison Meadows Café/Kitchen Renovation Phase One
15
Madison Meadows Café/Kitchen Renovation Phase Two
16
Madison Meadows Café/Kitchen Renovation Complete
19
Upcoming Projects Spring and Summer 2013 Café renovations at Heights, including active daylighting Café renovations at Rose Lane, including active daylighting Café renovations at Park, including active daylighting Sidewalk replacement and security fencing at Meadows Continued HVAC replacement at Park Additional roof replacement at Heights Non-skid surfacing replacement at Madison #1 and Meadows Concrete replacement at Simis Interior hallway painting at Camelview Questions
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.