Presentation is loading. Please wait.

Presentation is loading. Please wait.

Submission Title: TG6 Closing Report for the Session in November 2009

Similar presentations


Presentation on theme: "Submission Title: TG6 Closing Report for the Session in November 2009"— Presentation transcript:

1 Submission Title: TG6 Closing Report for the Session in November 2009
Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: TG6 Closing Report for the Session in November 2009 Date Submitted: November 20, 2009 Source: Arthur Astrin Contact: Arthur Astrin (Astrin Radio) Voice: , Re: TG6 Closing Report for November 2009 Session Abstract: Closing Report for the TG6 Session in November 2009. Purpose: To summarize activities during the meeting Notice: This document has been prepared to assist the IEEE P It is offered as a basis for discussion and is not binding on the contributing individual(s) or organization(s). The material in this document is subject to change in form and content after further study. The contributor(s) reserve(s) the right to add, amend or withdraw material contained herein. Release: The contributor acknowledges and accepts that this contribution becomes the property of IEEE and maybe made publicly available by P Arthur Astrin (Astrin Radio)

2 12th Meeting as a Task Group 6
November 2009 IEEE TG6 Body Area Network Closing Report 12th Meeting as a Task Group 6 Atlanta, GA November 20, 2009 Arthur Astrin (Astrin Radio)

3 Session Merger Results
November 2009 Session Merger Results NICT-YNU-Meiji-TI-Philips-GE-Toumaz-Fujitsu-CEA-FT-Thales-Tensorcom-Olympus-(LG)(Mitsubishi)(NIST) Samsung-ETRI-CUNY-KETI-KORPA-Inha-CNU-CSEM Others in progress Slide 3 Arthur Astrin (Astrin Radio) Arthur Astrin (Astrin Radio)

4 Merger Status November 2009 Samsung-ETRI-CUNY-KETI-KORPA-Inha-CNU-CSEM
1 Samsung-ETRI-CUNY-KETI-KORPA-Inha-CNU-CSEM 2 NICT-YNU-Meiji-TI-Philips-GE-Toumaz-Fujitsu-CEA-FT-Thales-Tensorcom-Olympus-(LG)(Mitsubishi)(NIST) 3 IMEC OR GD 4 Zarlink Arthur Astrin (Astrin Radio)

5 Contribution Presentations
November 2009 Contribution Presentations samsung-etri-cuny-keti-korpa-inha-merged-baseline.ppt biological-effects-of-wpt-systems-for-mics-and-needs-for-standardization-of-wpt-systems.ppt harq-for-high-qos-applications-of-bans.pdf nict-ynu-meiji-uwb-phy-proposal-some-aspects-of-chirp-pulse-based-ir-uwb-physical-layer.pdf sleeping-channel-measurements-for-ban.pdf super-merged-ban-baseline-for-tg6.ppt secure-mac-proposal-for-ban.pdf key-negotiation-for-ieee devices-using-the-host-identity-protocol-hip-8207.ppt Arthur Astrin (Astrin Radio)

6 Private Merge Discussions
November 2009 Private Merge Discussions Numerous off-line merge discussions were carried among different parties for both PHY and MAC. More merge announcements are expected in January meeting. Arthur Astrin (Astrin Radio)

7 Technical Editor Team November 2009 1 Daniel Lewis NICTA ALL, English
Marco Hernandez NICT UWB PHY 3 Bin Zhen MAC All 4 Kamya Yazdandoost 5 Kiran Bynam Samsung 6 John Faserotu CSEM 8 Sana Ullah Inha University 9 Gang Ding Olympus 11 Jahng Park HBC PHY MAC 12 Shin Hara NB PHY 13 Ranjeet Kumar Patro MAC, Security 14 Jin-Meng Ho TI 15 Anuj Batra Arthur Astrin (Astrin Radio)

8 Will have teleconferences when needed
November 2009 Teleconferences Will have teleconferences when needed Arthur Astrin (Astrin Radio)

9 Timeline 2010 November 2009 Merge Proposals >
2009 2010 9 10 11 12 1 2 3 4 5 6 7 8 Merge Proposals > Agree content for Baseline Draft Draft Work Technical Comments Resolution Draft Ready for 1st letter ballot 1st letter ballot complete Resolution of comments, 1st recirculation 1st re-circulation complete Resolve comments, 2nd recirculation, apprv 2nd re-circulation complete Resolve comments, 3rd recirculation apprv. Arthur Astrin (Astrin Radio)

10 Plans for January 2010 meeting
November 2009 Plans for January 2010 meeting Continue merging proposals and work on resolving conflicts. Begin editing baseline draft and write the illustrative text Receive normative text of proposals in Word .doc format Combine the normative texts and remove redundancies. Arthur Astrin (Astrin Radio)

11 Thank You ! Any Questions ?
November 2009 Thank You ! Any Questions ? Arthur Astrin (Astrin Radio)

12 Purpose of Proposed Standard (PAR 07-0575)
November 2009 Purpose of Proposed Standard (PAR ) The purpose of the proposed standard it to provide an international standard for a short range (ie about human body range), low power and highly reliable wireless communication for use in close proximity to, or inside, a human body. Data rates, typically up to 10Mbps, will be offered to satisfy an evolutionary set of entertainment and healthcare services. Current PANs do not meet the medical (proximity to human tissue) and relevant communication regulations for some application environments. They also do not support the combination of reliability (QoS), low power, data rate and noninterference required to broadly address the breadth of body area network applications. Arthur Astrin (Astrin Radio)

13 Need for the Project (PAR 07-0575)
November 2009 Need for the Project (PAR ) There is a need for a standard optimized for ultra low power devices and operation on, in or around the human body to serve a variety of applications including medical and personal entertainment. Examples of the applications served by the proposed standard are: EEG, ECG, EMG, vital signals monitoring (temperature (wearable thermometer), respiratory, wearable heart rate monitor, wearable pulse oximeter, wearable blood pressure monitor, oxygen, pH value , wearable glucose sensor, implanted glucose sensor, cardiac arrhythmia), wireless capsule endoscope (gastrointestinal), wireless capsule for drug delivery, deep brain stimulator, cortical stimulator (visual neuro-stimulator, audio neuro stimulator, Parkinson’s disease, etc…), remote control of medical devices such as pacemaker, actuators, insulin pump, hearing aid (wearable and implanted), retina implants, disability assistance, such as muscle tension sensing and stimulation, wearable weighing scale, fall detection, aiding sport training. This will include body-centric solutions for future wearable computers. In a similar vein, the same technology can provide effective solutions for personal entertainment as well.The existence of a body area network standard will provide opportunities to expand these product features, better healthcare and well being for the users. It will therefore result in economic opportunity for technology component suppliers and equipment manufacturers. Arthur Astrin (Astrin Radio)


Download ppt "Submission Title: TG6 Closing Report for the Session in November 2009"

Similar presentations


Ads by Google