Download presentation
Presentation is loading. Please wait.
Published bySudomo Indradjaja Modified over 5 years ago
1
802.18 RR-TAG Closing Report Report of September 2008 plenary meeting
November 2008 RR-TAG Closing Report Report of September 2008 plenary meeting Work completed at this meeting Michael Lynch, Nortel Networks
2
Report of November Plenary Meeting
Approved 2 outputs: To ITU-R WP5D stating IEEE 802’s intent to submit technology proposals for IMT-Advanced To ITU-R WP5D providing further input on the modification of Recommendation ITU-R M.1457 Approved a procedure for submission of IMT-Advanced inputs to ITU-R WP5D Established time line for the submission process The EC approved that the RR-TAG will be the approval authority for those submission Michael Lynch, Nortel Networks
3
Status of Planned Objectives for November Meeting
Updated the criteria for reviewing IMT-Advanced inputs to ITU-R WP5D Obtained EC approval for modified approval process at September, 2009 wireless interim Prepare input to FCC on white spaces rules – deferred to 01/09 Review impact of EN – deferred to 01/09 Begin revision of Recommendation ITU-R M.1450 – to be completed by correspondence Michael Lynch, Nortel Networks
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.