Presentation is loading. Please wait.

Presentation is loading. Please wait.

The Ventitian Hotel Macau

Similar presentations


Presentation on theme: "The Ventitian Hotel Macau"— Presentation transcript:

1 The Ventitian Hotel Macau
November 2001 doc.: IEEE /468r0 March 2016 101st Session of meetings of the IEEE Working Group for Wireless Personal Area Networks March 13-18, 2016 The Ventitian Hotel Macau Macau, China Robert F. Heile, Wi-SUN Alliance Robert F. Heile

2 802.15 Organization Chart March 2016 To add your name
802.15WG Chair Bob Heile, Wi-SUN Alliance Vice Chairs Rick Alfvin, VeriLAN Pat Kinney, Kinney Consulting Organization Chart Secretary Pat Kinney, Kinney Consulting Assistant Secretary Mike McInnis, Boeing Working Group Technical Editor James Gilb To add your name to the WG/TG/SG/IG reflectors please go to STUDY GROUPS: SG12 Consolidated LLC (CLLC) Chair: Pat Kinney, Kinney Consulting SG4v Regional Sub Gig Bands (RSB) Chair, Kunal Shah, Silver Spring Nets INTEREST GROUPS IG TeraHertz (THZ) Chair: Thomas Kürner, Technische Universität Braunschweig IG Dependability (of Radio Links) Chair: Ryuji Kohno, IG High Rate Rail Communications Chair: Junhyeong Kim, ETRI IG 6Tisch IG 15.4 Guide Chair: TBD SCs for New Projects (WNG), Maintenance, Rules Chair: Pat Kinney, Kinney Consulting Task Groups TG3d 100Gbps PHY Thomas Kuerner, Chair Technische Universität Braunschweig TG7R Optical Wireless Communications Yeong Min Jang, Kookmin University Chair TG3e High Rate Close Proximty Chair: Andrew Estrada, Sony TG8 Peer Aware Communcations Chair: Miung Lee, CUNY TG3m 15.3 Revison 1 Chair: James Gilb, Gilb Consulting TG9 Key Management Protocol Chair: Robert Moskowitz, Verizon TG4s Spectrum Resource Use (SRU) Chair: Shoichi Kitazawa, ATR Wave Eng TG10 Layer 2 Routing Chair: Clint Powell TG4t High(er) Rate PHY (HRP) Chair, Clint Powell, Powell Consulting open SG4u India Band PHY (ISB) Chair, Phil Beecher, Wi- SUN Robert F. Heile, Wi-SUN Alliance

3 Macau Session Objectives March 13-18, 2016
TASK GROUP 3d –100Gbps THz PHY Review and Discuss Contributions Resolve comments on 15.3d change PAR/CSD Secure EC approval to forward PAR to NesCom Update Project Plan/Timeline TASK GROUP 3e –High Rate Close Proximity (HRCP) Letter Ballot Comment Resolution TASK GROUP 3m –15.3 REVISIONa Secure EC approval to forward to RevCom Robert F. Heile, Wi-SUN Alliance

4 Macau Session Objectives March 13-18, 2016
TASK GROUP 4s Spectrum Resoucre Utilization(SRU) Work on Technical Guidance Doc (TGD) Prepare the CFP Update Project Timeline Task Group 4t 15.4 High(er) Rate PHY (HRP) Review contributions for CFP Update Project Task Group 4u PHY for band in India Resolves comments on PAR/CSD if any Secure EC approval to forward to NesCom Robert F. Heile, Wi-SUN Alliance

5 Macau Session Objectives March 13-18, 2016
Task Group 7m Optical Wireless Communications (OWC) Review and discuss contributions Continue developing TGD Generate/Update Project Timeline TASK GROUP-8 Peer Aware Communications Continue work on draft Update Project Plan/Timeline TASK GROUP 9 –Key Management Protocol: Approved by RevCom March 4- project complete Robert F. Heile, Wi-SUN Alliance

6 Macau Session Objectives March 13-18, 2016
TASK GROUP 10--Layer 2 Routing (L2R): Letter Ballot comment resolution Update Project Plan/Timeline STUDY GROUP Upper Layer Interface (ULI) Secure EC approval to forward PAR to NesCom Joint Meeting with 802.1 STUDY GROUP 4v –Add/Update Regional Sub Gig Bands THz Interest Group: Hear contributions relating to THz comms. Review ongoing mission/goals/new project potential Robert F. Heile, Wi-SUN Alliance

7 Macau Session Objectives March 13-18, 2016
Dependability Interest Group: Discuss Contributions Evaluate if Study Group is warranted High Rate Railroad Communications IG Discuss opportunities for standards work Review ongoing mission of the group 6 TiSCH Interest Group Hear contributions Get updated on IETF94 outcomes NEW PROJECTS SUBCOMMITTEE (WNG) Review/discuss contributions Robert F. Heile, Wi-SUN Alliance

8 March 2016 Robert F. Heile, Wi-SUN Alliance

9 March 2016 Upcoming Sessions May 15-20, 2016, Hilton Waikoloa Village, Kona, HI, USA, 802 Wireless Interim Session.* July 24-29, 2016, Manchester Grand Hyatt, San Diego, CA, USA, 802 Plenary Session.  September 11-16, 2016, Marriott Warsaw, Warsaw, Poland, 802 Wireless Interim Session.* November 6-11, 2016, Grand Hyatt San Antonio, San Antonio, TX, USA, 802 Plenary Session. January 15-20, 2017, Hyatt Regency Atlanta, Atlanta, GA, USA, 802 Wireless Interim Session.* March  12-17, 2017, Hyatt Regency Vancouver, 802 Plenary Session. May 7-12, 2017, Daejeon Convention Center, Daejeon Korea (TBC), 802 Wireless Interim Session.* July 9-14, 2017, Estrel Hotel and Convention Center, Berlin, Germany, 802 Plenary Session. Robert F. Heile, Wi-SUN Alliance


Download ppt "The Ventitian Hotel Macau"

Similar presentations


Ads by Google