Presentation is loading. Please wait.

Presentation is loading. Please wait.

September 2006 Melbourne Meeting Slides

Similar presentations


Presentation on theme: "September 2006 Melbourne Meeting Slides"— Presentation transcript:

1 September 2006 Melbourne Meeting Slides
Doc.: IEEE /1428r2 September 2006 September 2006 September 2006 Melbourne Meeting Slides Date: Authors: Notice: This document has been prepared to assist IEEE It is offered as a basis for discussion and is not binding on the contributing individual(s) or organization(s). The material in this document is subject to change in form and content after further study. The contributor(s) reserve(s) the right to add, amend or withdraw material contained herein. Release: The contributor grants a free, irrevocable license to the IEEE to incorporate material contained in this contribution, and any modifications thereof, in the creation of an IEEE Standards publication; to copyright in the IEEE’s name any IEEE Standards publication even though it may include portions of this contribution; and at the IEEE’s sole discretion to permit others to reproduce in whole or in part the resulting IEEE Standards publication. The contributor also acknowledges and accepts that this contribution may be made public by IEEE Patent Policy and Procedures: The contributor is familiar with the IEEE 802 Patent Policy and Procedures < ieee802.org/guides/bylaws/sb-bylaws.pdf>, including the statement "IEEE standards may include the known use of patent(s), including patent applications, provided the IEEE receives assurance from the patent holder or applicant with respect to patents essential for compliance with both mandatory and optional portions of the standard." Early disclosure to the Working Group of patent information that might be relevant to the standard is essential to reduce the possibility for delays in the development process and increase the likelihood that the draft publication will be approved for publication. Please notify the Chair as early as possible, in written or electronic form, if patented technology (or technology under patent application) might be incorporated into a draft standard being developed within the IEEE Working Group. If you have questions, contact the IEEE Patent Committee Administrator at C. Wright, Azimuth Systems, Inc. C. Wright, Azimuth Systems, Inc.

2 Welcome to TGT Evaluation of 802.11 Wireless Performance
Doc.: IEEE /1428r2 September 2006 September 2006 Welcome to TGT Evaluation of Wireless Performance Charles R. Wright C. Wright, Azimuth Systems, Inc. C. Wright, Azimuth Systems, Inc.

3 Proposed Agenda for Melbourne Meetings
Doc.: IEEE /1428r2 September 2006 September 2006 Proposed Agenda for Melbourne Meetings Chair comments Appoint secretary Approve minutes 11-06/1034r2 – San Diego Approval of agenda Call for presentations 11-06/1484r0, “Proposal for resolution of comment 165 for P D0.9”, S. Tolpin (15 min) 11-06/1388r0, “Unavoidable Packet Loss Issue in a/g PHY”, T. Alexander (30 min) 11-06/1490r0, “The Need for TRP and TIS in ”, M. Foegelle (30 min, Thurs AM1) 11-06/1501r0, “Multipath Testing in a Conducted Environment”, C. Wright (45 min, Thurs AM1) 11-06/1526r0, “Comment resolution for the COAT environment”, D. Victor (45 min, Thurs PM1) Editor’s report (11-06/1417r0) Presentations in Item 5 as they are ready Additional comment resolution Process discussions Review of published T timeline (see Fixed time: 2:15 PM Thursday – motion to approve all comments resolved during this session New Business IETF/BMWG liaison letter, 11-06/1538r0 Future telecons Ad hoc meeting? C. Wright, Azimuth Systems, Inc. C. Wright, Azimuth Systems, Inc.

4 Meeting Schedule for this Week
Doc.: IEEE /1428r2 September 2006 September 2006 Meeting Schedule for this Week Monday Tuesday Wednesday Thursday 8:00 TGT TGT 9:30 11:00 12:30 Lunch 1:30 TGT Opening TGT TGT Closing 3:30 4:00 6:00 Dinner 7:30 TGT 9:30 C. Wright, Azimuth Systems, Inc. C. Wright, Azimuth Systems, Inc.

5 September 2006 A Brief TGT History Study Group formed – 1st meeting January 2004 (Vancouver) PAR approved August 2004 Task Group formed – 1st meeting September 2004 (Berlin) Guidelines for proposals agreed – March 2005 (Atlanta) First accepted proposal – May 2005 (Cairns) Many accepted proposals have followed Started Issues List – September 2005 (Garden Grove) Internal Review conducted June-July 2006 Comment resolution and preparation for Letter Ballot Current intent is LB after November 2006 meeting C. Wright, Azimuth Systems, Inc.

6 TGT Standards Process Milestones
September 2006 TGT Standards Process Milestones Task Group considered the current timeline for TGT Mindful that there are many outstanding work items to complete before we can forward the draft for Letter Ballot, the TG decided to move the expected date of Letter Ballot to after the January, meeting Chair will update the timeline accordingly 2005 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec We are here 1st LB 1st Recirc 2006 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec 2nd Recirc 1st SB 2007 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec SB Recirc WG/SEC approval REVCOM approval 2008 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec C. Wright, Azimuth Systems, Inc.

7 “Deferred” Comments September 2006 Clause 4 Clause 5 Clause 5.2
268, 269, 147, 148, 280 All are similar and awaiting a submission from F. Pirzada Clause 5 161 Possible resolution is to eliminate the “test template” format from the test environments sections Clause 5.2 141, 229, 11, 12, 16, 21, 22, 24, 27, 28, 31 A variety of comments, no one common theme Clause 5.3 270, 36, 236, 284, 40, 142, 165, 49 Clause 5.7 240 Awaiting a submission General 303 Waits for clause 4 reorganization C. Wright, Azimuth Systems, Inc.

8 Process discussion Task Group considered the current timeline for TGT
September 2006 Process discussion Task Group considered the current timeline for TGT Mindful that there are many outstanding work items to complete before we can forward the draft for Letter Ballot, the TG decided to move the expected date of Letter Ballot to after the January, meeting Chair will update the timeline accordingly C. Wright, Azimuth Systems, Inc.

9 Motion to accept comments resolved during teleconferences
Doc.: IEEE /1428r2 September 2006 September 2006 Motion to accept comments resolved during teleconferences Move to accept resolutions from comment IDs 32, 289, 235, 237, 41, 44, 47, 48, 283, 50, 285, 262, 249 Moved/Second: S. Tolpin/N. Sharma Y/N/A: 9/0/2 Motion passes C. Wright, Azimuth Systems, Inc. C. Wright, Azimuth Systems, Inc.

10 September 2006 Motion #2 Move to accept the contents of document 11-06/1484r0 into the draft and to consider comment ID 165 resolved Move/Second: S. Tolpin/M. Kobayashi Y/N/A: 5/0/1 Motion passes C. Wright, Azimuth Systems, Inc.

11 September 2006 Motion #3 Move to accept document 11-06/0906r0, “TRP and TIS Performance Metrics Proposed Text” into the P draft Move/Second: M. Foegelle/R. Kennedy Yes/No/Abstain: 7/9/2 Motion fails C. Wright, Azimuth Systems, Inc.

12 September 2006 Straw Poll Should TGT augment the conducted environment to include testing the effects of multipath in the manner described in 11-06/1501r0? Yes: 10 No: 1 C. Wright, Azimuth Systems, Inc.

13 September 2006 Motion #4 Move to replace the current contents of Subclause 5.2 in the P draft with the contents of document 11-06/1526r2. Move/Second: D. Victor/S. Tolpin Y/N/A: 5/1/2 Motion was reconsidered and then tabled, due to procedural errors in uploading the correct version of the document. The changes directed by this motion will not be implemented. C. Wright, Azimuth Systems, Inc.

14 September 2006 Motion #5 Move to accept resolutions of the following comments, as contained in document 11-06/872r11 and direct the editor to incorporate the resolutions into the next P draft: 251, 255, 256, 257, 143, 144, 145, 146, 52, 53, 54, 55, 59, 60, 61, 62, 63, 64, 65, 123, 67, 70, 261, 116, 158, 157, 124, 125, 126, 171, 128, 127, 129, 156, 274, 177, 273, 275, 302, 130, 131, 132, 134, 135, 136, 137, 138, 139, 140, 173 Move/Second: S. Tolpin/N. Sharma Y/N/A: 4/0/4 Motion passes C. Wright, Azimuth Systems, Inc.

15 September 2006 Motion #6 Move to recommend that the WG accept document 11-06/1538r1 as the liaison response to the IETF/BMWG Move/Second: P. Ecclesine/N. Sharma Y/N/A: 7/0/0 Motion passes C. Wright, Azimuth Systems, Inc.

16 New Business Possible telecon schedule:
September 2006 New Business Possible telecon schedule: Thursday Oct 5 Wednesday Oct 11 Thursday Oct 19 Wednesday Oct 25 Thursday Nov 2 Wednesday Nov 8 Discussion of work to be done on teleconferences COMMENT RESOLUTION! C. Wright, Azimuth Systems, Inc.

17 Telecons between September and November 802.11 meetings
Motion to empower TGT to hold telecons Time: 12 noon Eastern (US) time Duration: 1 hour Dates: Thursday Oct 5 Wednesday Oct 11 Thursday Oct 19 Wednesday Oct 25 Thursday Nov 2 Wednesday Nov 8 Moved/second: N. Sharma/R. Kennedy Y/N/A: 7/0/1 Motion passes C. Wright, Azimuth Systems, Inc.

18 September 2006 Backup Information C. Wright, Azimuth Systems, Inc.

19 TGT Approved Document List
September 2006 TGT Approved Document List 11-04/1553r2, “Guidelines for TGT Formal Metric and Methodology Proposals” 11-05/912r3, “TGT Process Document” 11-06/872r9, “Compiled Comments from Internal Review” (latest version of comment resolution spreadsheet) C. Wright, Azimuth Systems, Inc.

20 Teleconference Info Date: Thursdays
September 2006 Teleconference Info Date: Thursdays Time: 12 Noon Eastern time (no matter what the daylight savings time status) Duration: 1 hour Phone #  International: Passcode: Next: TBD C. Wright, Azimuth Systems, Inc.

21 September 2006 Reflector reflectors: Requires membership to send to it Getting on the reflectors Instructions are contained in every reflector posting for customizing your reflector experience (including unsubscribing) rules require all TG communication to be through reflector C. Wright, Azimuth Systems, Inc.

22 References for 802.11 Newcomers (1 of 2)
September 2006 References for Newcomers (1 of 2) Web site: Document server: Sign up for an account No need to be an member to get an account Once logged in, “join” : Click on “ WLAN WG” on left In center window, choose to become a new member Click again on “ WLAN WG” An additional subitem called “Documents” will be revealed – click on it You’ve reached the document server! C. Wright, Azimuth Systems, Inc.

23 References for 802.11 Newcomers (2 of 2)
September 2006 References for Newcomers (2 of 2) Document numbering scheme WG-YY-NNNN-RR-gggg-English-document-title.ext WG = 802 working group number, e.g. “11” as in YY = two digits of year NNNN = document number RR = document revision number gggg = group to which the document pertains Example: t-jan-2006-waikoloa-meeting-slides.ppt C. Wright, Azimuth Systems, Inc.


Download ppt "September 2006 Melbourne Meeting Slides"

Similar presentations


Ads by Google