Presentation is loading. Please wait.

Presentation is loading. Please wait.

TGz Closing Report Date: Authors: November 2007 Month Year

Similar presentations


Presentation on theme: "TGz Closing Report Date: Authors: November 2007 Month Year"— Presentation transcript:

1 TGz Closing Report Date: 2007-11-15 Authors: November 2007 Month Year
doc.: IEEE yy/xxxxr0 November 2007 TGz Closing Report Date: Authors: Menzo Wentink (Conexant) John Doe, Some Company

2 TGz Goals for Atlanta (Nov 07)
Month Year doc.: IEEE yy/xxxxr0 November 2007 TGz Goals for Atlanta (Nov 07) Hear presentations, discuss draft, process Menzo Wentink (Conexant) John Doe, Some Company

3 Accomplishments Heard presentations
Month Year doc.: IEEE yy/xxxxr0 November 2007 Accomplishments Heard presentations Discussed updated draft text document Adopted TGz Draft 0.1 Determined further work to be done Menzo Wentink (Conexant) John Doe, Some Company

4 Submissions 11-07-2515-08-0dls-tunneled-direct-link-setup
Month Year doc.: IEEE yy/xxxxr0 November 2007 Submissions dls-tunneled-direct-link-setup z-tunneled-direct-link-setup-with-channel-switching z-path-selection-and-switch-mechanism z-direct-transmission-in-PSM z-avoid-frame-reordering -recover-active-state z-dls-power-save-delivery Menzo Wentink (Conexant) John Doe, Some Company

5 Output Documents 11-07-2761-04-000z-tgz-atlanta-2007-agenda.ppt
Month Year doc.: IEEE yy/xxxxr0 November 2007 Output Documents z-tgz-atlanta-2007-agenda.ppt z-tgz-atlanta-2007-agenda.ppt z-tgz-atlanta-2007-agenda.ppt z-tgz-atlanta-2007-agenda.ppt z-tgz-atlanta-minutes-adhoc.doc z-atlanta-nov-13-am2-meeting-minutes.doc z-tgz-minutes-for-nov-15-session.doc z-tgz-atlanta-closing-report.ppt Menzo Wentink (Conexant) John Doe, Some Company

6 Teleconferences Move to have conference calls as follows: Moved: Guido
July 2007 doc.: IEEE yy/xxxxr0 Menzo Wentink, Conexant Teleconferences Move to have conference calls as follows: Nov 27, Dec 11, Jan 8 1 hour Time: 10:30am ET Moved: Guido Second: David Result: Unanimous November 2007 Menzo Wentink, Conexant

7 To Do until Taipei Discuss approach to channel switching
July 2007 doc.: IEEE yy/xxxxr0 November 2007 To Do until Taipei Discuss approach to channel switching Add reason codes to path switch request/response Prepare rationale and detail for direct link power save delivery (unscheduled and scheduled) Should we address potential reordering on path switch when EDCA is used Add sentence to exclude secure direct link when AP is not secure, think about possible solution for this case Menzo Wentink (Conexant) Menzo Wentink, Conexant

8 Taipei Meeting Objectives
Month Year doc.: IEEE yy/xxxxr0 November 2007 Taipei Meeting Objectives Hear presentations, improve draft. Menzo Wentink (Conexant) John Doe, Some Company

9 Backup November 2007 Month Year doc.: IEEE 802.11-yy/xxxxr0
Menzo Wentink (Conexant) John Doe, Some Company

10 January 2005 doc.: IEEE yy/xxxxr0 November 2007 TGz Timeline Initial Working Group Letter Ballot: March 08 Re-circulation Working Group Letter Ballot: September 08 Form Sponsor Ballot Pool: December 08 Initial Sponsor Ballot: March 09 Re-circulation Sponsor Ballot: May 09 Final WG Approval: July 09 Final EC Approval: July 09 RevCom/Standards Board Approval: September 09 IEEE Publish: October 09 Menzo Wentink (Conexant) Dorothy Stanley, Agere Systems

11 July 2007 doc.: IEEE yy/xxxxr0 Menzo Wentink, Conexant Motion 5 Move to approve dls-tunneled-direct-link-setup as TGz draft 0.1 Mover: Guido Hiertz Seconder: Alexander Safonov Result: Yes 17 No 0 Abstain 2 November 2007 Menzo Wentink, Conexant


Download ppt "TGz Closing Report Date: Authors: November 2007 Month Year"

Similar presentations


Ads by Google