1 PCS Envelope Concept Status of the project
V1.0, by M. Soldini, PCS Envelope Concept Status of the project © 2019 by FTE © 2015 by FTE Bern,

2 3. 9 July 2019  new session tbc, according to FTE proposal
PCS Envelope Concept PCS EC Test-Session Location: Vienna February  no / very low progress towards October for the functionalities in PCS EC Core-System October 2018-February 2019: PCS Interface has been developed. It will be presented at PCS TB on 7 March 2019. 2. 14 May  very important session The most of functionalities should be available for testing. 3. 9 July  new session tbc, according to FTE proposal 4. 10 September RCA, Sibelit and RCC Hungary are checking if new testers could join the PCS EC Test-Group. © 2019 by FTE Bern,

3 PCS Envelope Concept PCS EC Go into Production Final date: not yet decided. It will depend on the Test-results during the Test-Session on 14 May and on 9 July Planned was: 2 September New situation: Rolling Planning Process (TTR) will be implemented already in August 2019 in PCS NG and at later time it will be «migrated» in PCS EC. For this reason the deadline of 2 September 2019 for Go into Production must not be kept and can be postponed about 4-6 weeks (tbc). Ideal date: about the 14 October 2019 ? Question: can we put PCS EC into Production before creating all IM national parameters by the IMs (to be checked: October 2019). NB: on 15 October 2019 the RFCs must publish the Reserve Capacity for tt2020. © 2019 by FTE Bern,

4 PCS Envelope Concept PCS EC Training Target: Learn PCS EC new functions and preparing the dossiers for tt2021 in PCS EC Production. The user will use the functionality «Carry forward» for copying the dossiers from tt2020 into tt2021 directly in PCS EC Production. Preparation of FTE A ( ). Feasibility Study Request Deadline: Monday for tt2021 Exigent task for the leading RUs due to the fact that after the migration of the dossiers tt2020 from PCS NG Active tt into PCS EC Active tt the structure of the dossiers tt2020 will not be up-dated in PCS EC. And we assume that the migrated dossiers in PCS EC will have very different data structure evaluated from «good» (comprehensible) until «very bad» (uncomprehensible) depending on the complexity of each dossier. © 2019 by FTE Bern,

5 PCS Envelope Concept PCS EC Training Precondition / Recommandation : the IMs prepare the national IM parameters from 15 until 25 October Mate Bak will clarify on PCS CCB on 28 February 2019 if the IMs agree to solve this task until 25 October Dossiers of tt2020 should be in AT in PCS EC Production (Migration closed). Leading RUs know the (new) timetable concept to be created in PCS EC for tt PCS EC Training should takes place a short time before the dossier creation. © 2019 by FTE Bern,

6 PCS EC Training Concept 2018 PCS Envelope Concept © 2019 by FTE
Bern,

7 PCS Envelope Concept PCS EC Training Variant A (dates tbc by JO RNE) First draft proposal: 29, 30, 31 October 2019 (in Vienna) Concept (same as for November 2018): 29 October (9-18h) only for RUs 30 October (9-13h) only for RUs 30 October (14-18h) for IMs and some selected RUs (RUs from Test-Group) 31 October (9-16h) for IMs and some selected RUs (RUs from Test-Group) Participants: 1 user for company (about users) exceptions are possible as DB F (2 users) or ÖBB P (2 users) © 2019 by FTE Bern,

8 PCS Envelope Concept PCS EC Training Variant B Second draft proposal: During the Marketing/Production Conference in Ostrava between the November Meeting is organized by CD P (Martin Konecny) Not under the responsability of FTE-Office Invited RUs/Companies: BC, BDZ, CFR Calatori, DB Fernverkehr, HZ, MAV-S, ÖBB, PKP, RZD, SBB, SNCF, SZ, UZ, ZPCG, ZS, ZSSK Normally the meeting takes place from Tue 12 until Thu 14 November If we organize the PCS EC Training we should: 1) fix the Marketing/Production Conference from Mon to Wed November ) fix the PCS EC Training Thu to Fri November But we should organize a second meeting in another location with the «missing RUs» and with the IMs. © 2019 by FTE Bern,

9 PCS Envelope Concept PCS EC Training Variant C (dates tbc by JO RNE) Third draft proposal: 19, 20, 21 November 2019 (in Vienna) Concept (same as for November 2018): 19 November (9-18h) only for RUs 20 November (9-13h) only for RUs 20 November (14-18h) for IMs and some selected RUs (RUs from Test-Group) 21 November (9-16h) for IMs and some selected RUs (RUs from Test-Group) Participants: 1 user for company (about users) exceptions are possible as DB F (2 users) or ÖBB P (2 users) © 2019 by FTE Bern,

10 PCS Envelope Concept PCS EC Training Variant D (dates tbc by JO RNE) Fourth draft proposal: 26, 27, 28 November 2019 (in Vienna) Concept (same as for November 2018): 26 November (9-18h) only for RUs 27 November (9-13h) only for RUs 27 November (14-18h) for IMs and some selected RUs (RUs from Test-Group) 28 November (9-16h) for IMs and some selected RUs (RUs from Test-Group) Participants: 1 user for company (about users) exceptions are possible as DB F (2 users) or ÖBB P (2 users) © 2019 by FTE Bern,

11 PCS EC Training Calender 2019 Calender 2020 PCS Envelope Concept
3 weeks in December 2019 for preparing the dossiers for tt2021 Calender 2020 1 week in in January 2020 for preparing the dossiers for tt2021 © 2019 by FTE Bern,

12 PCS Envelope Concept PCS EC Training Possible Calendar to be discussed with RUs, IMs and RNE based on P PCS EC Training either on or on             PCS EC is ready for going into Production (first opening only for IMs for preparing the IM national parameters for tt2021)           IMs create the IM national parameters for tt2021             Migration of all dossiers from PCS NG to PCS EC, by RNE / NCA                                              JO RNE, together with the support of RUs, IMs and RFCs for understanding the data written in each dossier, up-dates all dossiers tt2020 in PCS EC that didn’t reach the phase AT on = Migration-Date.                                  At the end of October we estimate the number of dossiers P/F for tt2020 that will not be in AT a very low (<100 dossiers). or           P Training (Learn the Basic-Functions) Action : Carry Forward of the dossiers tt2020 into tt2021                                 Leading RUs have to up-date the dossiers and put them in the right data structure using the new data known from the Route-Meetings in October/November 2019. © 2019 by FTE Bern,

13 PCS Envelope Concept Migration of Dossiers from PCS NG into PCS EC Date: to be defined. After the migration the PCS NG Version will be frozen and the RUs / IMs will have only reading rights (for 6 months ?). The RUs are invited to create a PDF File for each dossier as final status in PCS NG for tt2020 before the migration. © 2019 by FTE Bern,

14 Migration of Dossiers from PCS NG into PCS EC
PCS Envelope Concept Migration of Dossiers from PCS NG into PCS EC PCS NG PCS EC At the date X all dossiers and all tt periods will be migrated from PCS NG into PCS EC, by JO RNE / Netcetera Case 1: In PCS NG the dossiers of tt2020 are in the phase Active tt (before the migration). Estimation: over 95% of all dossiers (if migration after 15.10) After the migration the dossiers will not be up-dated / rectified. That means: The RUs accept inconsistencies. The process Path Modification and Path Alteration will be realized via the national systems. AT tt2020 migration AT tt2020 The leading RUs will use the function «Carry Forward» for copying the dossiers of tt2020 into tt2021 in the Phase Open. This action will take more time as usual due to the fact that the dossiers must be up-dated. © 2019 by FTE Bern,

15 Migration of Dossiers from PCS NG into PCS EC
PCS Envelope Concept Migration of Dossiers from PCS NG into PCS EC PCS NG PCS EC Case 2: In PCS NG the dossiers of tt2020 are yet in the phases Path Elaboration, Observations, Post-Processing (before the migration) migration PE tt2020 PE tt2020 Obs tt2020 PP tt2020 FO tt2020 AT tt2020 1. After the migration the dossiers will be up-dated / rectified by JO RNE with the support of the leading RU, IM and RFC in order to understand the content of each dossier in the right way. Question: JO RNE can up-date the RU-tt in PE, Obs or PP even if during these phases no writing rights are allowed in RU-tt.  to be clarified. 2. The users RU, IM and RFC check the correctness of the dossiers and continue to work in the dossiers. They switch them until the Phase Active tt. Precondition: users know the new functions of PCS EC. 3. The leading RUs will use the function «Carry Forward» for copying the dossiers of tt2020 into tt2021 in the Phase Open. © 2019 by FTE Bern,

16 PCS Envelope Concept Next official PCS EC Test-Meeting already planned : 26 February 2019, in Vienna FTE-Office extended the JO RNE invitation to all RUs Passenger and Freight that tested the system on 18 October 2018 (before the postponement’s decision). Freight RUs: DB C DE (Julia Weiss), RCA (Manfred Grosser) 1), SNCF Fret (Gabriel Seguette, Remi Tourenne), Sibelit (Dominique Louppe) 1) 1) already excused. Lineas (Benny de Smedt) and RCA (Karl Bauer) are looking for new Tester in Freight Traffic. Passenger RUs: DB F (Matthias Lück), ÖBB (Josef Wurzenberger), NS R (Peter Bouman), SBB (Laurent Stalder, Corinne Engelberger), SNCF (Fabrice Peigné), Thalys (Jean Quaeyhaegens), Trenitalia (Giampiero Ciprigno) © 2019 by FTE Bern,