Download presentation
Presentation is loading. Please wait.
Published byNoel Johns Modified over 5 years ago
1
Pole of EDF Breaker © ABB Group May 2, 2019 | Slide 1
2
Spare pole of EDF Breaker Customer Benefit
Spares pole planning supports the objectives of power plant operators & maintenance personnel Reduce downtime in case of an major failure/unexpected down time Reduce outage time during preventive maintenance (expected downtime) Replacement of spare pole can be done within 8 hours. © ABB Group May 2, 2019 | Slide 2
3
Spare pole of EDF Breaker Scope of offer
Supply of Complete spare pole of EDF CB Replacement of spare pole in Breaker(option of doing form PSC or LSC ) © ABB Group May 2, 2019 | Slide 3
4
© ABB Group May 2, 2019 | Slide 4
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.