Presentation is loading. Please wait.

Presentation is loading. Please wait.

doc.: IEEE <doc#1>

Similar presentations


Presentation on theme: "doc.: IEEE <doc#1>"— Presentation transcript:

1 doc.: IEEE 802.15-<doc#1>
<September 2010> doc.: IEEE <doc#1> <September 2010> Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Resolution of TG6 comments: S7-285, S7-286] Date Submitted: [22 September, 2010] Source: [Rick Powell] Company [Zarlink] Address [15822 Bernardo Center Dr, Ste B, San Diego, CA, 92127] Voice:[ ], FAX: [ ], Re: [Proposed Resolution of D0 Comments S7-285, S7-286] Abstract: [Comment resolution for letter ballot 55 for S7-285, S7-286] Purpose: [Propose Resolution of D0 Comment S7-285, S7-286] Notice: This document has been prepared to assist the IEEE P It is offered as a basis for discussion and is not binding on the contributing individual(s) or organization(s). The material in this document is subject to change in form and content after further study. The contributor(s) reserve(s) the right to add, amend or withdraw material contained herein. Release: The contributor acknowledges and accepts that this contribution becomes the property of IEEE and may be made publicly available by P <Rick Powell>, <Zarlink> <Rick Powell>, <Zarlink>

2 Proposed Resolution of D0 Comment S7-285, S7-286
<September 2010> Proposed Resolution of D0 Comment S7-285, S7-286 Comments relative Access Mechanisms for Type-I/II Access Phases. <Rick Powell>, <Zarlink>

3 doc.: IEEE 802.15-<doc#1>
<September 2010> doc.: IEEE <doc#1> <September 2010> D0 Comment S7-285 Page 76, Sub-clause , Line 32 Comment: Type - I access phase Proposed Change: Specify, what are the channel access mechanism applicable in this phase. Proposed Resolution: Subclause specifies the access mechanisms of Type-I access phase with the exception of unscheduled access. Add the following to : “The hub may also provide Unscheduled Type-I and Type-II Poll Allocations and Unscheduled Post Allocations in Type-I Access Phase.” <Rick Powell>, <Zarlink> <Rick Powell>, <Zarlink>

4 doc.: IEEE 802.15-<doc#1>
<September 2010> doc.: IEEE <doc#1> <September 2010> D0 Comment S7-286 Page 77, Sub-clause , Line 10 Comment: Type - II access phase Proposed Change: Specify, what are the channel access mechanism applicable in this phase. Proposed Resolution: Subclause specifies the access mechanisms of Type-I access phase with the exception of unscheduled access. Add the following to : “The hub may also provide Unscheduled Type-II Poll Allocations and Unscheduled Post Allocations in Type-II Access Phase.” <Rick Powell>, <Zarlink> <Rick Powell>, <Zarlink>


Download ppt "doc.: IEEE <doc#1>"

Similar presentations


Ads by Google