1 DN Interruption Reform
Gas Customer Forum 27th July 2009

2 Agenda Background to DN Interruption Reform
Outcome of 2008 DN Interruption tender DN Analysis Proposed Approach Next Steps

3 Background to DN Interruption Reform
Implemented 1 April 2008 DNs tender for interruption rights three years ahead of use DNs incentivised to procure appropriate level of interruption and investment in networks Fewer interruptibles from 2011 onwards

4 Outcome of 2008 DN Interruption Tender
Post 2011 Interruptible Load % peak load No. of sites SGN <1 7 NGN 1.05 5 NGG 0.2 WWU 0.4 4

5 All DNs Prelude

6 All DNs Post Mod 90

7 Approach Identify Firm Load Shedding Capability post Mod 90
Establish a target based on the performance achieved in Exercise Prelude NEC wants speed and confidence on DN deliverability Load shed in 4 hours LDZ specific Resources available for Site visits where required Shipper obligations remain to maintain site contact details

8 Example – NGG Analysis Prelude

9 Example – NGG Analysis post Interruption Reform

10 Next Steps Revised DN Safety Case submissions August 2009
DN Best Practice Preparation Data Validation [NG top 200 per LDZ] Site Visits > 2 million therms [NG 212 across 5 LDZs] NEC involved Industry Engagement GATG, Distribution w/stream, Gas Customer Forum Emergency Exercises (2009 and 2010) Highlight Target Customers Recycling Contact Information Escalating Contact Information Increased Number of Site Visits Revised DN Safety Case submissions August 2009