START OF REVISION OF UR TUNNEL INTEGRATION
Stephane Maridor – WP15
2
AIM : Update, iterate the 3D layout of equipment inside UR tunnel to create new baseline version before end of September. HOW : Study the new concept, add new equipment (asked by user RRF), add improvement -> presentation for discussion, modification, iteration,.., agreement , -> validation (by WP concerned). (we propose to meet each 15 days) -> new baseline
3
RAPPEL : UR tunnel CIVIL ENGINEERING DIFFERENCE BETWEEN P1 AND P5 ( UR ) P1 P5
4
RAPPEL : UR tunnel Trench for sclink are defined , we have to deal with. 30 m
5
Baseline until now !
6
New version Status : in work ! (taking into account the Rack Requirement Form)
7
DFH surface allocation
+ 3 spare pc rack + 1 racks for current lead + racks PLC for switch ? + current lead & switch (CDB )? DFH surface allocation This proposal is not yet discussed (current lead + cdb) 20 m2 new TOP VIEW baseline transformer position modified 21 m2
8
+ 3 racks for current lead + 1 racks PLC for switch /IP
+ 1 rack for PC control + current lead & switch (CDB ) DFH surface allocation 15 m2 15 m2 (+ 7x 0.54m2) (+ 2 x 0.54m2) new TOP VIEW baseline Moved to UL14-16 (not yet approved) ECR WP6A ? 30 m2 + 4 m !
9
DFH surface allocation new 15 m2 15 m2 FRONT VIEW 30 m2 baseline
10
13KA 18KA 13KA 18KA Possible VARIANTE 13KA Should be more compact
11
Spare for pc Racks zone new baseline
12
new baseline
13
+ 3 racks for current lead + 1 racks PLC for switch /IP
DFH surface allocation + 3 racks for current lead + 1 racks PLC for switch /IP + 1 rack for PC control + current lead & switch (CDB ) (+ 2 x 0.54m2) (+ 7x 0.54m2) 15 m2 15 m2 new + 4 m ! baseline 30 m2 Moved to UL14-16 (not yet approved) ECR WP6A ?
14
DFH surface allocation
+ 3 spare pc rack + 1 racks for current lead + racks PLC for switch ? + current lead & switch (CDB )? DFH surface allocation This proposal is not yet discussed (current lead + cdb) 20 m2 new baseline
15
Extra slides
16
1.6 m transport 1.8 m 1 m 2.7 m
17
13kA 8 X 2 kA 18kA DFHX 2 DFHX 1
18
8 X 2 kA 18kA 13kA DFHX 2 DFHX 1
19
8 X 2 kA DFHX 2
26
13kA 18kA DFHX 1
27
8 X 2 kA