1 Working with Agencies March 26, 2019 Kale Walch

2 Hexcel background Manufacturing of honeycomb blocks CAA permits RCRA
On site since 1966 Dip Room RTOs for control of VOCs CAA permits PSD permit with BACT controls Title V operating permit RCRA Large Quantity Generator ISO 14001

3 Permits Permit applications Revisions Send comments on draft permits
Pre-meeting with agency Explain the process Revisions Work with the agency before submitting Send comments on draft permits Call or for interpretations Use the agency’s knowledge Understand your permit Use the citations to look up the rules

4 Permit Revisions Predictions are not always accurate
Design changes Market changes Construction permit must be accurate Working with operations Permitting non-process or tangential items Leave enough time to obtain permit PCAQCD needs time to write the permit Public Comment period – 30 days EPA review period – 45 days

5 Stack Testing Protocol approval Requests for variances
Opportunity to save time and money Might have to do it again Turn in timely Discussions between the agency and the source Miscommunication can be expensive Requests for variances Design impacts Some facility components were not built with stack testing in mind Weather impacts Safety, malfunctions

6 Stack Design

7 Weather impacts

8 Miscommunications

9 Inspection Entry Rights
Utilized by City, County and State agencies Take the time to read Accompany inspector Take samples or read opacity with inspector Opacity readings versus screens Provisions designed to provide benefits for industry

10 Contractors Dust Permits Asbestos surveys Refrigeration servicing
Who obtains the permit Who is responsible for dust control Asbestos surveys Stop and resolve problems Refrigeration servicing New rules Recycling, recharging, large units

11 Reporting and Recordkeeping
Ask for interpretations Try not to procrastinate Use technology to your advantage Recent reductions in required reporting Facility Annual Report (FAR) MyDEQ defining who needs to submit Discharge Monitoring Reports (DMR) Pollution Prevention Plans (P2) going paperless

12 Wastewater Operations
Work with the City Communication Reporting excursions Use their knowledge Total Suspended Solids monitoring

13 Enforcement Process Deviations Notice of Opportunity to Correct
Notice of Violation Order of Abatement by Consent Many off ramps are built into the system The response is often more important than the original act Procrastination limits options typically increases costs

14 ISO 14001 Communication Log Calendar of events Outreach events
Emergency Response Plan coordination Participation in voluntary programs Stakeholder participation ADEQ PCAQCD City Others

15 Government Apps and Technology
PCAQCD forecast AirNow ( Twitter MyDEQ ( Pipeline and Hazardous Materials Safety Administration ( ERG 2016 free app (National Library of Medicine) Chemical Safety Board ( Training Videos

16 Contact information Kale Walch Hexcel (office) (cell)