Presentation is loading. Please wait.

Presentation is loading. Please wait.

DRRIF WORKING GROUP PROGRESS

Similar presentations


Presentation on theme: "DRRIF WORKING GROUP PROGRESS"— Presentation transcript:

1 DRRIF WORKING GROUP PROGRESS
1 Meeting of the connected Ulm Follow-Up Working Group held in Bonn on 27 May 2014 1 Meeting of the WG held in Vienna on 01./02. September 2014 Topics: DRRIF Feasibility Study Progress Current national developments in opening-up national programmes and coordination of funding mechanisms Update on the Danube-INCO.NET activities Presentations of the EUREKA scheme, Twinning (Horizon 2020) and the envisaged BMBF Call Relations to Horizon 2020 Delegates and potential inputs to the Work Programmes 2016/2017

2 DRRIF WORKING GROUP PROGRESS
DRRIF Feasibility Study – Involvement of the Working Group Contractors have asked for the nomination of contact persons for the study – large overlap with the DRRIF Group Input to a questionnaire/data for the absorption capacity study part Mandate of the WG = Monitoring of the progress until the study is finalised – final document will be approved by the SG Extensive discussions and feedback with the contractor in Sept. 2014; Approval of the fist part of the study with some specific requests for modification (more details under the next agenda point).


Download ppt "DRRIF WORKING GROUP PROGRESS"

Similar presentations


Ads by Google