1 Solar Energy Commercialization Session 16
SEC598S19 Solar Energy Commercialization Session 16 Utility Scale Solar Development Installation & Commissioning March 11, 2019

2 Session 16 - Value to class members
This session examines utility scale installation and commissioning processes, including: Site preparation Site access Equipment installation Electrical components Monitoring

3 Utility Scale PV Systems (References)
A.Fong and J.Tippett, Project Development in the Solar Industry, CRC Press, 2013 S.Neill, G.Stapleton, and C.Martell, Solar Farms, Routledge, 2017

4 Utility Scale PV Systems
Design Steps Selecting an appropriate site and solving all land issues Carrying out the permitting process for construction and operation Selecting a financing approach including power purchase agreements or energy off-take agreements Carrying out PV system and solar field engineering and design Interconnection to the grid

5 Utility Scale - Solar Farm Design
Steps in Solar Farm Design Design calculations Electrical design considerations System monitoring System equipment selection Installation issues Yield calculations

6 Utility Scale - Solar Farm Installation
Solar Farms Chapter 5

7 Utility Scale - Solar Farm Installation
Solar Farms Chapter 5

8 Utility Scale - Solar Farm Installation
Steps in Solar Farm Installation Preparation Site Contractors Construction Plan Tasks, subtasks, and duration of each Health and safety requirements Restrictions placed on any task Contingency of each task Milestones and key dates Interdependencies between tasks Parties responsible for tasks Project critical path Actual progress compared to plan Solar Farms Chapter 5

9 Solar Farm Design – Installation
Foundations Helical Piles Solar Farms Chapter 5

10 Solar Farm Design – Installation
Foundations Driven Piles Solar Farms Chapter 5

11 Solar Farm Design – Installation
Foundations Ballasts Solar Farms Chapter 5

12 Solar Farm Design – Installation
Mounting Frames Solar Farms Chapter 5

13 Solar Farm Design – Installation
Mounting Frames Solar Farms Chapter 5

14 Solar Farm Design – Installation
Mounting Frames Solar Farms Chapter 5

15 Solar Farm Design – Installation
Mounting Frames Solar Farms Chapter 5

16 Solar Farm Design – Installation
Mounting Frames Solar Farms Chapter 5

17 Solar Farm Design – Installation
Mounting Frames (midclamps) Solar Farms Chapter 5

18 Solar Farm Design – Installation
Module wiring MC4 Solar Farms Chapter 5

19 Solar Farm Design – Installation
Module wiring Minimized inductive loop Large inductive loop Solar Farms Chapter 5

20 Solar Farm Design – Installation
Module wiring Solar Farms Chapter 5

21 Utility Scale PV Systems
Commissioning Commissioning includes (but is more than) a set of start-up or closeout procedures, which are generally steps employed before energizing any electrical component to ensure electrical safety. Commissioning is defined as a standardized and unbiased process that not only guarantees the safe operation of a PV system, but also confirms, via independent verification activities, that its documentation is correct and that it is performing as expected. Ref [2]

22 Utility Scale PV Systems
Commissioning Commissioning may include “in-house” testing by the solar installation companies, but most contracts specify the inclusion of a third-party commissioning report – for validation and verification The third-party evaluator represents the system owner, not the installer Ref [2]

23 Utility Scale PV Systems - Commissioning
Preconstruction Commissioning process begins during the project planning stage: To prepare a construction inspection list To analyze job hazards To develop a plan that reflects test priorities Ref [2]

24 Utility Scale PV Systems - Commissioning
Preconstruction Prepare checklists Standard and Codes Analyze hazards OSHA requirements Develop test plans Visual examination Performance tests Operational tests Ref [2]

25 Utility Scale PV Systems - Commissioning
Postconstruction Verification Installation is complete Installation is safe Installation is aesthetically acceptable Installation is robust and permanent System performance and operation Documentation As-built conditions Acceptance forms Ref [2]

26 Utility Scale PV Systems - Commissioning
System performance and operation Verification of performance Nameplate System factor Irradiance factor Temperature factor Ref [2]

27 Utility Scale PV Systems - Commissioning
System performance and operation Voltage measurements Vmp for each string VOC for each string Ground fault checks VOC from + to ground and VOC from - to ground Ref [2]

28 Utility Scale PV Systems - Commissioning
System performance and operation IR thermography Cracked cells, hotspots Defective diodes, failed modules Non-operational strings Walk through and/or aerial (drone) examinations Ref [2]

29 Utility Scale PV Systems - Commissioning

30 Utility Scale PV Systems - Commissioning

31 Utility Scale PV Systems - Commissioning
I-V curve tracers

32 Utility Scale PV Systems - Commissioning
Additional Resources