1
Power industry transformer demise
Why does insurance complicate investigation? Lim Sze Hue BEng (Electrical) Forensic Services Asia Pte Ltd
3
Steel Copper Wood
4
Steel Copper Wood
8
Bushing Steel Tap changer Copper Wood
9
Locations of oil in a transformer
Tap Changers
10
UK Statistics 50% of the UK national grid transformer population has aged 40 years or more. Data is from 2010
11
UK Statistics Average life 21.3 years
12
Transformer Age at the Time of Failure
FSA Statistics Transformer Age at the Time of Failure No. of investigations Life (years)
13
50% of the UK national grid transformer population has aged 40 years or more.
Data is from 2010
17
Bushing Tap changer
18
Effect of Water
19
15/20 MVA 230/6.9kV
27
Effect of Temperature
28
11kV to 170V, 37 to 50kA Electric arc furnace transformer
Failed in only 10 years
30
Molecule repeats 1000 -1100 times
Over time, paper molecule fragments
33
Furan Testing When celluose (paper insulation) molecule de-polymerises, chemicals known as furan compounds or furan is formed. The five furans and their most common causes are listed below. Rare, lightning
34
A B C D E (A) Normal aging rate (D) High risk of failure
(B) Accelerated aging rate (E) End of expected life of paper (C) Extensive aging, danger zone insulation and of the transformer
35
Oil purification in July 2014; Failed Sept 2014.
33.6/33.6/15 MVA in ONAN 56/56/25 MVA in ONAF 132/15/11 kV Step down transformer at an steel electric arc furnace facility Operated since 1984; Oil change in 1992; Oil purification in July 2014; Failed Sept 2014.
39
Bushing Tap changer
40
Conductor, usually aluminium
Bushing oil Ceramic sheds Transformer tank wall Oil impregnated alternating paper/aluminium Transformer oil
42
Video of exploding transformer
45
168 MVA, 10.5/275 kV 8
53
Direct Clientele Independant power producers
Power utility service provider Electrical equipment manufacturer Oil & gas plants Chemical plant Medical equipment Building tenant Global Food Manufacturer
54
Power Utility Service Provider
55
Comparison between Direct Appointment and Insurance Claims: Time taken to provide requested information
56
No. of investigations
57
No. of investigations For three investigations, we never received the condition monitoring records
58
6.876MVA
62
Final Statement