Download presentation
Presentation is loading. Please wait.
1
Transmission Workstream 1st February 2007
Capacity Transfers Transmission Workstream 1st February 2007
2
Scope of Inter-nodal Capacity Transfers / Trades
Constrained Period Shipper led process Unconstrained NGG led process Entry Trades (sold capacity) Transfers (unsold capacity) Transfer of unsold capacity in response to User signals. Intent is to minimise NTS investment. Exit NB – Mod 116v would permit inter-zonal exit (flex) capacity trades
3
Capacity Release Methodology Statements
Constrained Period Unconstrained Entry Entry Capacity Transfer Rate Methodology Statement Entry Capacity Trade Rate Methodology Statement Incremental Entry Capacity Release Methodology Statement (SC C15) Exit Exit Capacity Baseline Revision Methodology Statement Exit Capacity Release Methodology Statement (SC C18) * New statements required under the proposed licence
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.