1 Railway Infrastructure Projects
Republic of Serbia Ministry of Construction, Transport and Infrastructure Railway Infrastructure Projects

2 Characteristics of the Republic of Serbia railway network
3739 km railway lines, from which: 3444 km of single track lines 295 km of double track lines 1546 km electrified 44% of network is designed for axel load of 22,5 t 872 km railway lines on Corridor X Current maximum projected speeds 120 km/h 334 tunnels (153 km), 956 bridges (40 km) 2132 level crossings

3 Orient East Med Corridor on the territory of WB6
Railway lines within Orient East Med Corridor: Section: Budapest – Subotica – Beograd – Niš – Presevo - Skopje – Gevgelija – Thessaloniki Section: Stalać – Kraljevo – Priština – General Jankovic - Skopje (Trubarevo) Section: Beograd (Resnik) – Vrbnica - Podgorica – Bar

4 Completed Railway Projects
Section Gilje-Cuprija-Paracin, railway line Beograd-Nis, 10,5 km, financed by EIB IV loan, € 45,9 mil. Procurement of materials for six sections, 112 km, EBRD 4, € 30,2 mil. Three northern sections of Corridor X, 65,7 km, financed by a loan from the Russian Federation and RS budget, $ 48,7 mil. Three southern sections of Corridor X (railway line Nis-Presevo), 46,5 km, financed by a loan from the Russian Federation and RS budget, $ 37,1 mil. Reconstruction of the railway section Resnik - Valjevo (railway line Belgrade - Border with Montenegro), 77,6 km, Russian Federation and RS budget, $ 72 mil. Construction of a bridge over the Danube river in Novi Sad, financed by EU, City of Novi Sad, AP Vojvodina and and RS budget, € 57,2 mil. Reconstruction and modernization of section Junction G-Rakovica- Resnik (Belgrade nod), 7,5 km, financed by EBRD 5 loan, € 23,7 mil.

5 Completed Railway Projects
Overhaul 271,5 km of regional railway lines, RS budget and budget of Infrastructure Manager, € 127 mil. Overhaul railway section Predejane-Dzep (Koridor X), 4,5 km, budget of Infrastructure Manager, € 1,9 mil. Construction of railway station Belgrade Center - Prokop I (Phase 1), Kuwaiti Fund for Arab Economic Development, € 23,7 mil. Procurement of 27 diesel engines (DMV), Russian Federation and RS budget, $ 100 mil. Procurement of 21 EMU, EBRD € 100 mil.

6 Ongoing Railway Projects
Reconstruction and modernization of section Belgrade Centre-Stara Pazova (railway line Belgrade-Subotica-BCP with Hungary), 34,5 km, financed by a loan from Chinese EXIM Bank and RS budget, $ 350,2 mil. Construction of tunnel and viaducts on section Stara Pazova-Novi Sad (railway line Belgrade-Subotica- BCP with Hungary), 4,2 km, financed by a loan from the Russian Federation and RS budget, $ 337,6 mil. Reconstruction and modernization of section Stara Pazova-Novi Sad (railway line Belgrade-Subotica-BCP with Hungary), 40,4 km, financed by a loan from the Russian Federation and RS budget, $ 247,8 mil. Project goal: construction, modernization and reconstruction of the part of the existing railway and the construction of the new track to provide a double- track railway line for passenger and freight traffic for speeds of up to 200km/h.

7 Ongoing and projects under preparation
Reconstruction of railway line Jajinici – Mala Krsna 59 km and overhaul of station Mala Krsna , financed by EBRD loan , € 39,3 mil. Renewal of Electrical Infrastructure, EBRD, € 3,5 mil. Procurement of tamping machines, EBRD Procurement of track recording cars, EBRD, € 2,2 mil. Procurement of heavy motorized railcars, EBRD, € 4,5 mil. Procurement of Software for making timetable, EBRD Рepair and modernization of 5 multipurpose electric motor sets, EBRD, € 3,5 mil. Procurement of new multisystem electric locomotives, EBRD, € 64 mil.

8

9 Projects Under Preparation
Reconstruction and modernization of railway line Nis-Dimitrovgrad, 108 km, financed by WBIF grant, EIB loan and RS budget, € 268,2 mil. Construction Intermodal terminal in Batajnica, IPA and RS budget Reconstruction and modernization of section Nis-Brestovac (railway line Nis- Presevo), 23 km, financed by IPA 2015 and RS budget, € 62,7 mil. Innovation of complex railway Technical passenger station Zemun -TPS Zemun, € 47 mil. Overhaul 327,5 km of regional railway lines, RS budget and budget of Infrastructure Manager, € 30,7 mil.

10 Planned Railway Projects
Reconstruction, modernization and construction of the second track of section Novi Sad-Subotica (railway line Belgrade-Subotica-BCP with Hungary), 108,2 km, value $ mil. The creditor is Chinese EXIM bank. Reconstruction and modernization of the Belgrade-Nis railway line (remaining portion of 198 km): Reconstruction and modernization of section Resnik-Kovacevac-Velika Plana (57,9 km) Reconstruction and modernization of section Velika Plana-Stalac (74 km) (IPA for technical documentation) Reconstruction, modernization and construction of second track Stalac-Đunis (17,5 Km) (WBIF grant for technical documentation) Reconstruction and modernization of section Đunis - Niš (48,64 km) (IPA for technical documentation) Reconstruction and modernization of the sections on the railway line (Nis) Brestovac-Presevo- border with Republic of Macedonia (remaining part of 88 km) (WBIF grant for technical documentation) Reconstruction and modernization of the double track section Stara Pazova - Golubinci-Šid-BCP with Croatia (86 km) (WBIF grant for technical documentation) Reconstruction and modernization railway section Valjevo – Vrbnica-BCP with Montenegro (railway line Belgrade-Vrbnica-BCP with Montenegro, 209,8 km) Project for construction of a single operational center for managing the railway traffic on the railway network of the Republic of Serbia Procurement of new EMU. The creditor is EBRD, € 100 mil.

11

12 Thank you for your attention!
Republic of Serbia Ministry of Construction, Transport and Infrastructure Thank you for your attention!