Download presentation
Presentation is loading. Please wait.
1
USAA Development Life Cycle
02/08/2018 USAA Development Life Cycle Grant Lindsey – Engineer Greg Weaver – IT Director
3
Waterfall – The Old USAA
4
Waterfall Phases CD Phase – Concept Definition
CV1 Phase – Concept Validation 1 (Requirements) CV2 Phase – Concept Validation 2 (Analysis & Design) FSD1 Phase – Full Scale Development 1 (Coding, Unit Testing & Integration Testing) FSD2 Phase – Full Scale Development 2 (System Testing & Implementation) IMP Phase – Implementation (Warranty)
5
Scaled Agile Framework (SAFe) – The New USAA
6
Agile Tracking
7
Overview USAA Technology Project Initialization Development Testing
Release Maintenance Note: from an Agile – Scrum perspective
8
USAA Technology Linux, Java, IBM Websphere
Moving towards cloud-based containerized architecture New web, REACT, presentation and serverside JS, investigating AWS Supplier Systems Could be anything… Real Estate’s main supplier uses .NET
9
Project Initialization
What is the business need? Gathering requirements, writing the User Acceptance Criteria Finding the right team for the job I’m a developer, why are we talking about this part of the cycle???
10
Development Assigning the work to the engineers Where’s the code?
Compiling the workspace Running locally**** Unit testing – CI/CD Merge with stream
11
Testing Integration testing Integration to Staging/Runway environments
Integration testing with your team Integration to Staging/Runway environments Company wide, larger scale end-to-end tests Environment as Prod-like as possible Analysis of defect severity
12
Release Pre-Prod environments Multiple server farm rolling deploy
Production Validation Business Signoff Go back to sleep
13
Maintenance Warranty period Major Incident Management
Ticket support / Knowledge Articles
14
Q&A ?
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.