Download presentation
Presentation is loading. Please wait.
Published bySonny Widjaja Modified over 5 years ago
1
Module # 10 Review of Field Day 2 Data Collection
Iowa’s River Restoration Toolbox Level 1 / Base Training
2
Purpose of Field Day 2 BANCS Riffle Armor Pebble Counts Bar Sample
General Stability
3
Pebble Counts & Bar Samples
3. Obtain Sieve Analysis at the location of the largest particle on lower 1/3 of point bar or other depositional feature 1. Obtain a 100-particle pebble count on 10 transects from bankfull to bankfull throughout the reach (Classification) 2. Obtain a 100-particle pebble count in the riffle bed (Sediment Transport)
4
Wolman Pebble Counts
5
BEHI Study Form Develop Adjective Rating: Very Low Low Moderate High
Very High Extreme
6
Geology Form
7
Planform Stability Form
8
Bed Stability Form
9
Habitat Form
10
Infrastructure Form
11
Module # 10 Review of Field Day 2 Data Collection
Iowa’s River Restoration Toolbox Level 1 / Base Training
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.