Download presentation
Presentation is loading. Please wait.
1
EDO(N) Community Status Brief
2
EDO(N) Program Background
EDO(N) Program - established in 1997 Produces officers to serve as RCOH/NEWCON CVN Reactor Officers Provides Engineering Duty Officer community with officers qualified to be Major Program Managers or Major Shore Commanders Retains SWO(N)s for nuclear duty by providing a career path with fewer at-sea requirements Developed in conjunction with SWO(N) career path SWO(N) Community is sole source for EDO(N) accessions Lateral transfer of up to 10 SWO(N)s per YG (Nominal 2) EDO(N) NOIP policy modeled after SWO(N)s
3
EDO(N) Program Health EDO(N) Community Health
Average of 2 SWO(N)s per YG have transferred to EDO(N) community Community strength: 32 EDO(N)s at various phases of career Cadre of ED officers with CVN operational experience EDO(N) RO enhances Reactor Dept in RCOH/NEWCON/IA SY experience with organization/structure/production schedules Provides additional nuclear experience to ED community EDO(N)s fill nuclear related S/Y, planning, acquisition, and design billets
4
Growing a Successful RO Skillsets
Training Power School / Prototype / Quals / PNEO / ARPM/ NR PCO Course At Sea experience operating the plant Deployments with Flight Ops, Drills, Casualty Control Special Evolutions – Underway Testing, Major PMS(RM/RC), Sea Details In Port experience operating the plant Maintenance - Homeport / PIA / DPIA / RCOH / NRRO interaction Senior Supervisory Watch for special evolutions & testing Day to Day operations Admin Programs – PMS / RPPMS / LOQM / Check Chem / Matl Hist Audits and Surveillances / Training Leading People Drill Team / Watch Team Divo / CVN Divo / PA PPWO / EOOW PPWO / RDO DIVO / PA 52 months on CVNs – nominally 70 months total nuclear experience
5
Growing a Successful RO SWO(N) Career Path
BDOC/ 1st DO Sea Tour 23 mos NPS/NPTU 13 mos D H S 1st DH 18 mos ARPM/ CVN PA 25 mos 2nd Shore Window 48 mos 1st Shore 24 mos XO/CO 36 mos CVN RO Major Command DO 28 mos O4 CO P X O / C R XO/XO-SM tour Two nuke sea tours and one nuke shore tour prior to RO 2 4 6 8 10 12 14 16 18 20 22 24 DH Screen XO/CO MC PA CO/COSM SUCCESS in 1st Divo tour => SWO Pin SUCCESS at 28 months on CVN => PNEO Qual SUCCESS in Topside DH tour => Warfighter SUCCESSFUL PA tour => Nuclear Expertise XO/CO Fleet-up Screen
6
SWO(N) Community Requirements vs. Inventory 109 DIVOs/yr
~29 Nuclear Shore RQTS 19 PAs/yr ~24 Nuclear Shore RQTS 7 RO-MTT-NPTU / yr ~1 N9-NRLL / yr
7
EDO(N) Career Path and Boards
SWO(N) EDO(N) Nuclear Proficiency Tour ED Industrial ED Acquisition CVN PA Tour CVN RO 1st Shore Tour Post Graduate School NPGS or MIT EDQP Reactor Dept DivO SY CO SOS CO MPM NPS NPTU ED IND ED ACQ Topside 2 12 14 20 3 6.5 9 16 18 5 25 23 27 PA Continuation LAT XFER ARO Community Boards: Lateral transfer: ~6 YCS, Nominal 2-3, Maximum 10 per YG EDO(N) PA Board: YCS, Nominal 3 per YG (held on as-needed basis) Continuation Board: 14 and 15 YCS, Nominal 1 per YG ARO Board: 15 YCS following Continuation Board (held with SWO(N)s) RO Board: 17, 18 or 19 YCS, Screen to Requirements EDO(N)s who are not screened for RO remain EDOs and continue to remain competitive for Command
8
Assistant Reactor Officer Purpose
Enhance RO’s focus on the execution of propulsion plant operations, maintenance, and training by: Enforcing the standards, priorities, and departmental philosophy Providing an experienced quality cut on departmental administration Supporting external coordination requirements (TYCOM, RPPY, JTG, etc.) Leverage nuclear expertise of SWO(N) and EDO(N) officers no longer on track to be a Reactor Officer Would otherwise lose nuclear qualifications SWO(N)s not screened for CO Afloat EDO(N)s not selected for continuation and future RO eligibility at 15 YCS maintain eligibility for Nuclear Officer Incentive Pay
9
Assistant Reactor Officer Selection and Assignment
Picked by administrative board SWO(N)s following XO-SM or XO Afloat tours EDO(N)s following unsuccessful second look for continuation Nominally 3-4 officers needed each year Timing of the ARO tour dependent on ARO Billet Availability and the Officer’s career management timing for future statutory and administrative boards If possible, PERS 445 and 424 will work with Officer to ensure DAWIA requirements are completed prior to detailing to ARO tour Must be under orders to an ARO billet by 30 Sept of year following selection 36 month tour Financially incentivized Nuclear COPAY eligibility continues through ARO tour and beyond until reaching 21 YCS or 3 years away from nuclear billet (whichever occurs later)
10
EDO(N) Community Nominal Throughput
EDQP ARO Prof Tour RO SY CO SOS CO MPM Topside DivO Tour PA Continuation RO LAT XFER Nuclear Proficiency Tour ED Industrial ED Acquisition CVN PA Tour 1st Shore Post Graduate School NPGS or MIT EDQP CVN Reactor Dept NPS NPTU ED IND ED ACQ ARO or ED IND/ ED IND/ ED ACQ or ARO ARO Track 2 12 14 20 3 6.5 9 16 18 5 25 23 27
11
EDO(N) Program Nuclear Proficiency
4-year clock requirement between nuclear related assignments Clock stops post-RO CVN, nuclear shore, and non-nuclear shore tours sequenced to meet requirement Engineering Duty Qualification Program divided between nuclear/non-nuclear billets Nominally 18 months in nuclear billet Post-PA nuclear shore assignment required to maintain nuclear proficiency
12
EDQP Billets SUPSHIP Newport News – CVN New Construction Assistant Project Officer/ CVN Overhaul Assistant Project Officer Naval Shipyard - Ship Construction and Repair Superintendent (Nuclear) / Zone Manager Norfolk (2) Puget Sound (2) Portsmouth Pearl Harbor NSY – Ship Repair Officer / Assistant Project Supt (Submarines) SUPSHIP Newport News – Ship Project Officer/CVN Overhaul Assistant Project Officer * Norfolk NSY – Ship Construction and Repair Supt (Nuclear) / Nuclear Operations * Norfolk NSY – Ship Construction and Repair Supt (Surface Ships) / Zone Manager (Submarines) * Puget Sound NSY – Ship Construction and Repair Supt (Nuclear) / Nuclear Operations * Puget Sound NSY – Ship Construction and Repair Supt (Submarines) / Zone Manager * SUPHIP Groton – Naval Engineering Inspection Officer / Ship Coordinator * Pearl Harbor Naval Shipyard – Ship Repair Officer / Assistant Project Supt (Submarines) * SRF Yokuska - Ship Const and Repair Supt (General) * *Filled only if top billets unavailable
13
Post-PA Proficiency Billets
COMNAVAIRFOR/LANT N431 – Force Maintenance Officer COMNAVAIRFOR/LANT N43 – Ship Material Officer PMS312E – Propulsion Engineer NAVSEA 05V – CVN Deputy Ship Design Manager USFF N438A – Fleet Carrier Program Manager Naval Shipyard Assistant Project Superintendent, Nuclear (APS-N) Norfolk Puget Sound Portsmouth SUPSHIP Newport News Code 151 – Project Officer for Aircraft Carrier New Construction SUPSHIP Newport News Code 152 – Project Officer for Aircraft Carrier Overhaul NAVSEA 08P Assistant Program Manager Carriers
14
Backup
15
EDO(N) and EDO Career Paths
Standard ED Career Path EDQP Tour Warfare Qual DivO Tour/ SWOS 2nd Div-O Tour STAFF HQ PMS At-SEA ED Industrial ED Acquisition SY CO SOS CO MPM 2 12 14 20 3 6.5 9 16 18 5 25 23 27 Post Graduate School NPGS or MIT EDO URL EDO(N) Career Path Nuclear Proficiency Tour ED Industrial ED Acquisition CVN PA Tour RO 1st Shore Tour Post Graduate School NPGS or MIT EDQP CVN Reactor Dept DivO SWO(N) EDO(N) NPS NPTU ED IND ED ACQ SY CO SOS CO MPM Topside DivO Tour ARO or ED IND/ ED ACQ ED IND/ ED ACQ or ARO SY CO SOS CO MPM ED IND ED ACQ ED IND ED ACQ ARO Track 2 12 14 20 3 6.5 9 16 18 5 25 23 27 LAT XFER PA Continuation RO
16
EDO(N) Screening Boards
PA Screening Board Screen to nominal three officers per YG One Look: 10 YCS as required (to date none have been required) Continuation Screening Board Screen to nominal one officer per YG Two Looks: 14 and 15 YCS Officers at equivalent point in careers PG School, EDQP tour, and PA tour complete RO Screening Board Screen to requirements based on projected RO billets available Assigned for RCOH and NEWCON One Look: 17, 18 or 19 YCS Conducted minimum of every 3 years
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.