Presentation is loading. Please wait.

Presentation is loading. Please wait.

TGn Closing Report Denver, CO, US 802 Plenary – July ‘08

Similar presentations


Presentation on theme: "TGn Closing Report Denver, CO, US 802 Plenary – July ‘08"— Presentation transcript:

1 TGn Closing Report Denver, CO, US 802 Plenary – 14-18 July ‘08
doc.: IEEE /0830r0 July 2008 TGn Closing Report Denver, CO, US 802 Plenary – July ‘08 Date: Authors: Name Company Address Phone 5488 Marvell Lane, Santa Clara, CA, 95054 +1 (321) Bruce Kraemer Marvell marvell .com Sheung Li SiBEAM +1 (408) 555 Mathilda Ave, Sunnyvale, CA 94085 Adrian Stephens Intel Corporation 15 JJ Thompson +1 (503) intel.com Avenue, Cambridge, CB3 0FD, UK Bruce Kraemer, Marvell Bruce Kraemer (Marvell), Sheung Li (SiBEAM)

2 The TGn Streak Continues with
July 2008 doc.: IEEE /0830r0 July 2008 TGn Draft 5.0 The TGn Streak Continues with All 1112 recirculation ballot comments resolved in one meeting Bruce Kraemer, Marvell Bruce Kraemer (Marvell), Sheung Li (SiBEAM)

3 July 2008 doc.: IEEE /0830r0 July 2008 TGn Motion Having approved comment resolutions for all of the comments received from LB129 on Draft 5.0, And having prepared Draft 6.0 containing all of the approved comment resolutions, Move to begin as soon as possible, a 15 day Working Group Recirculation Ballot asking the technical question “Should P802.11n Draft 6.0 be forwarded to Sponsor Ballot?” TG: 35 approve, 0 not approve, 0 abstain Bruce Kraemer, Marvell Bruce Kraemer (Marvell), Sheung Li (SiBEAM)

4 Primary Meeting Documents
July 2008 doc.: IEEE /0830r0 July 2008 Primary Meeting Documents Chair’s Opening Report r5 Chair’s Closing Report r0 Meeting Minutes r0 Editor’s Report r1 Bruce Kraemer, Marvell Bruce Kraemer (Marvell), Sheung Li (SiBEAM)

5 TGn Teleconference Plan
July 2008 doc.: IEEE /0830r0 July 2008 TGn Teleconference Plan Call time: 11:00 – 13:00 ET Call number: Wednesday Blocking events Ad hoc group Meeting chair Bridge # Passcode July 16 Plenary July 23 ballot .19 Shellhammer? July 30 Aug 06 Aug 13 Aug 20 Aug 27 Sep 03 Ad hoc Sep 10 Interim Bruce Kraemer, Marvell Bruce Kraemer (Marvell), Sheung Li (SiBEAM)

6 TGn Newly Approved Timeline
July 2008 doc.: IEEE /0830r0 July 2008 TGn Newly Approved Timeline Event Name Accepted Dates Actual Predicted PAR Approved Sep ‘03 Initial WG Letter Ballot Mar ‘06 Recirculation WG Letter Ballot Oct ‘07 Form Sponsor Ballot Pool Jul ‘08 Initial Sponsor Ballot Nov ‘08 Recirculation Sponsor Ballot Jan ‘09 Final WG Approval Jul ‘09 Final EC Approval RevCom/ Stds Board Approval Sep ‘09 Publication Nov ‘09 Bruce Kraemer, Marvell Bruce Kraemer (Marvell), Sheung Li (SiBEAM)

7 July 2008 Ad hoc in September 2008 Request authorization for TGn to hold an ad hoc on Dates September 3,4,5 (Wed, Thur, Fri) in Hawaii, US with the venue of choice being the Hilton Kauai for the purpose of resolving comments received during LB1xx on Draft 6.0 Bruce Kraemer, Marvell


Download ppt "TGn Closing Report Denver, CO, US 802 Plenary – July ‘08"

Similar presentations


Ads by Google