Download presentation
Presentation is loading. Please wait.
Published byBrandon Savin Modified over 10 years ago
2
ICTT Vallarpadam First Trans-shipment terminal in India.
First container terminal to operate in a SEZ. Design capacity for 4 Million TEUs. BOT agreement for 30 years with CoPT.
3
Terminal Layout
4
Terminal Specifications: Final
Quay Length metres Depth Alongside metres (MSL) Max Draft Meters Max LOA meters Container Yard TEU ground slots Rail Tracks Reefer Points Points (415V, 3Phase AC)
5
Terminal Specifications: Phase 1A
Quay Length metres Depth Alongside metres (MSL) Max Draft Meters Max LOA meters Container Yard TEU ground slots Rail Tracks Reefer Points Points (415V, 3Phase AC)
6
Equipment : Final Super Post Panamax Quay Cranes 16
Mobile Harbor Cranes Rubber Tyred Gantry Cranes Reach stackers Empty Handlers Inter-Terminal vehicles (leased) Forklifts Hydra
7
Equipment: Phase 1A Super Post Panamax Quay Cranes 4
Mobile Harbor Cranes Rubber Tyred Gantry Cranes 15 Reach stackers Empty Handlers Inter-Terminal vehicles (leased) Forklifts Hydra
8
Advantages High productivity resulting in fast turnaround
CSS a web based system for online registration and monitoring of complaints. Faster vessel turn around time. Faster truck turn around time. Un-matched productivity. Direct services to various ports in the world. Better feeder connectivity to various Indian ports. Faster transit time. Savings on total cost. Ideal for JIT. No trans-shipment to base ports. Rail Connectivity to Bangalore, Coimbatore, Chennai, Hyderabad.
9
Thank You!
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.